Commissioned by Anglo Holt Ltd to design and implement a remediation strategy

Envirotreat Technologies Ltd was commissioned by Anglo Holt Ltd to design and implement a remediation strategy to address identified hydrocarbon contamination at a former manufacturing site in Bromsgrove and to enable discharge of the relevant planning conditions. Envirotreat designed an integrated remediation strategy which treated source contamination by E-Clay Stabilisation and groundwater contamination by the installation of an E-Clay Permeable Reactive Barrier around the site (thereby protecting both human health and controlled water receptors from the risk of pollution.). Envirotreat also implemented a ‘Discovery Strategy’ to address identified concerns with unexpected contamination in areas of the site which had not been fully investigated.
The site is being developed for retail purposes.

The photograph shows some of the contamination associated with the site.

Posted in

Delivering land you can develop

Envirotreat are a specialist remediation solution provider and sole providers of E-Clay technology