Envirotreat Technologies Ltd was commissioned by Thomas Vale to provide technical support services for the enabling works at a new school development in Primrose Hill Street, Coventry.
Envirotreat developed a remediation strategy to address the identified contamination issues on the site (predominantly hydrocarbon and asbestos contamination associated with historical activities on the site). The approved remediation strategy incorporated a ‘watching brief’ and analytical testing of soils / stockpiles at key stages during the enabling works – the objective was to provide a practical and cost-effective remediation approach for the site whereby geotechnically suitable material was retained on-site and only inert material was disposed of offsite (resulting in significant time and cost savings to the client).
The photograph shows the management of the enabling works through the ‘watching brief’.