Envirotreat Technologies Limited was engaged by Jehu Construction to provide a treatment solution for approximately 200 tonnes of spent oxide materials (“blue billy”) which had been identified on a development site in Tondu, Bridgend. Envirotreat carried out stabilisation of the “blue billy” utilising a specific E-Clay formulation designed to immobilise the leachable cyanide contamination. The treated stabilised materials were validated against agreed leachate criteria and subsequently reused on site.
The photo below shows the “blue billy” contamination: