Envirotreat and The Treatment Hub joined forces to carry out remediation works at a South Wales bus station that had suffered a significant escape of heating oil, the site was immediately adjacent to a river. Delta Simons Environmental Consultants engaged Envirotreat to carry out all excavation, delineation, verification and reinstatement works at the site whilst at all times protecting the adjacent river from any further impact from the contamination.
All excavated soils were taken to The Treatment Hub for treatment these soils were subsequently recycled and reused as restoration materials locally.
This is the first project where Envirotreat and The Treatment Hub have combined to provide a cost effective and sustainable remediation solution.