Site Investigation – Major redevelopment Cardiff

Envirotreat was commissioned to carry out a second phase of ground investigation for the proposed Cardiff Arena development, following on from the successful completion of the Phase 1 works in September 2020.

The works included the drilling of 8No. cable percussive and rotary follow-on boreholes to a maximum depth of 35m, trial pitting and soakage testing. In total, Envirotreat has drilled more than 350m of boreholes across the site, through some very difficult ground conditions.

Case study Atlantic Wharf, Cardiff Bay (envirotreat.com)

 