Remediation Method Statement

Niarbyl Cafe, Isle of Man – Environmental Consultancy Support

CLIENT:
Manx Heritage

REMEDIATION STRATEGY:
Off site disposal

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

New Inn Fire Station, Pontypool – PFAS Remediation

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
Permeable Reactive Barrier

CONTAMINATION:
PFAS

END USE:
Commercial

Read More »

Waun Gron, Cardiff – Site Investigation

CLIENT:
Wates

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Minsterley, Shropshire – Site Investigation

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

END USE:
Commercial

Read More »

Canalside South, Wolverhampton – Site Investigation

CLIENT:
Wavensmere

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Soils Testing – Langstone Business Park, Havant

CLIENT:
ADI

REMEDIATION STRATEGY:
Soils testing

CONTAMINATION:
N/A

END USE:
Commercial

Read More »

Site Investigation – Boden Mill, Chard

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Gas works

END USE:
Commercial

Read More »

Phase 1 Desktop Study, Erdington, Birmingham

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
N/A

END USE:
Residential

Read More »

Harborne, Birmingham – Remediation Method Statement & Validation

CLIENT:
Kiwi Design & Build

REMEDIATION STRATEGY:
Remediation Method Statement & Validation Report

END USE:
Residential

Read More »

Groundwater Monitoring – Barking Riverside, London

CLIENT:
Barking Riverside

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Landfill

END USE:
Residential

Read More »

Swansea, South Wales – Underground Tank Removal & Waste Management

CLIENT:
Confidential

REMEDIATION STRATEGY:
Underground Tank Removal & Waste Management

CONTAMINATION:
Hydrocarbon

END USE:
Residential

Read More »

Speke, Liverpool – Stormwater interceptor tank replacement

CLIENT:
Confidential

REMEDIATION STRATEGY:
Interceptor replacement and offsite disposal

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Site Investigation – Peel, Isle of Man

CLIENT:
Manx Utilities

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Hydrocarbon

END USE:
N/A

Read More »

Oil Spill Investigation, St Saviour, Jersey

CLIENT:
DB Cummins

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Site Investigation – Former Gas Works, Port St Mary, Isle of Man

CLIENT:
Haven Homes

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Gas works waste

END USE:
Residential

Read More »

Redditch Fire Station – PFAS Site Investigation

CLIENT:
Hereford and Worcester Fire and Rescue Service

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
PFAS

END USE:
Residential

Read More »

Eastleigh – Site Investigation and MMP

CLIENT:
ADI

REMEDIATION STRATEGY:
Site Investigation and MMP

CONTAMINATION:
TPH, PAH and heavy metals

END USE:
Commercial

Read More »

Havant – Ground Gas Risk Assessment

CLIENT:
ADI

REMEDIATION STRATEGY:
Gas monitoring

CONTAMINATION:
Brownfield Site

END USE:
Commercial

Read More »

Poole – Ground gas assessment

CLIENT:
Confidential

REMEDIATION STRATEGY:
Ground gas investigation

CONTAMINATION:
Ground gas

END USE:
Residential

Read More »

Hoddeston, Hertfordshire – Site Investigation

CLIENT:
Rawmech

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
TPH, PAH and heavy metals

END USE:
Commercial

Read More »

Newbury – Site Investigation

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Frome, Somerset – Phase 1 Desk Study and Site Walkover Survey

CLIENT:
Paragon (a Colliers Company)

REMEDIATION STRATEGY:
Site Walkover

CONTAMINATION:
N/A

END USE:
Commercial

Read More »

Swindon – Phase 1 Desk Study & Site Walkover Survey

CLIENT:
Paragon (a Colliers Company)

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
N/A

END USE:
Commercial

Read More »

Abbots Bromley, Rugeley – Phase 1 & 2 Site Investigation

CLIENT:
AJ Associates

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Friar Gate Goods Yard, Derby – Site Investigation

CLIENT:
Wavensmere

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Metals

END USE:
Residential

Read More »

Kidderminster – Site Investigation

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Brownfield Site

END USE:
Commercial

Read More »

Fairview Mill, Edinburgh – Site Investigation

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Brownfield Site

END USE:
Commercial

Read More »

Worcester University Teaching Block – Site Investigation

CLIENT:
Speller Metclafe

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Brownfield Site

END USE:
Educational

Read More »

Princip Street, Birmingham – Site Investigation

CLIENT:
Kavannagh Construction

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Brownfield Site

END USE:
Residential

Read More »

Hackney Wick, East London – Hydrocarbon Remediation

CLIENT:
O'Shea

REMEDIATION STRATEGY:
Excavation / disposal, E-Clay (Stabox) remediation, PRB, chemical oxidants groundwater treatment

CONTAMINATION:
TPH, PAHs and phenol

END USE:
Residential

Read More »

Port St Mary, Isle of Man – Remediation of a Former Gas Works

CLIENT:
Haven HOmes

REMEDIATION STRATEGY:
in-situ & ex-situ E-Clay Stabilisation and PRB

CONTAMINATION:
Ammonia, TPH, PAHs, Phenol

END USE:
Residential

Read More »

St Helier, Jersey – Gas Works Remediation

CLIENT:
ROK

REMEDIATION STRATEGY:
Integrated (E-Clay Stabilisation and PRB)

CONTAMINATION:
PAH, TPH and cyanide

END USE:
Residential with some commercial

Read More »

Redditch – PFAS Remediation

CLIENT:
Speller Metclafe

REMEDIATION STRATEGY:
Integrated strategy involving PFASorb Stabilisation and an E-Clay Permeable Reactive Barrier

CONTAMINATION:
PFAS

END USE:
Police and Fire Combined Hub

Read More »

Pontypool – Soil Management and Off Site Disposal

CLIENT:
Arcadis

REMEDIATION STRATEGY:
Offsite Disposal

CONTAMINATION:
Japanese Knotweed, heavy metals and hydrocarbons

END USE:
Industrial

Read More »

Milford Mills, Derby – Site Investigation

CLIENT:
Wavensmere Homes

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Stoke Ferry, Norfolk – Remediation Works

CLIENT:
Chalcroft

REMEDIATION STRATEGY:
ACM Remediation

CONTAMINATION:
ACM

END USE:
Residential

Read More »

The Gothic, Birmingham – Site Investigation

CLIENT:
Kavannagh Construction

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
N/A

END USE:
Residential

Read More »

Wobaston Road, Wolverhampton – Soil Management & Off Site Disposal

CLIENT:
Seconique

REMEDIATION STRATEGY:
Offsite Disposal

CONTAMINATION:
Asbestos (ACM) and TPH / BaP

END USE:
Commercial / Industrial

Read More »

St Clears, Camarthernshire – Soil Stockpile Analysis and WM3 Assessment

CLIENT:
JBHL

REMEDIATION STRATEGY:
Soils testing

CONTAMINATION:
Asbestos, TPH, Metals

END USE:
Residential

Read More »

Forge Works, Biddulph – Site investigation

CLIENT:
Keyworker Homes

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
N/A

END USE:
Residential

Read More »

Langstone Business Park, Havant – E-Clay Stabilisation

CLIENT:
ADI Building & Refurbishment

REMEDIATION STRATEGY:
E-Clay Stabilisation and watching brief

CONTAMINATION:
Hydrocarbon

END USE:
Commercial / industrial

Read More »

Staines – E-Clay Stabilisation, New Aldi / Lock n Store development

CLIENT:
ADI Building & Refurbishment

REMEDIATION STRATEGY:
E-Clay Stabilisation & watching brief

CONTAMINATION:
Hydrocarbon

END USE:
Retail & commercial

Read More »

Pembrey Racing Circuit / Gwynfaen – Transfer of Natural Soil to aid Housing Developments via DoWCoP

CLIENT:
Gower Plant

REMEDIATION STRATEGY:
Direct transfer of natural soils

CONTAMINATION:
N/A

END USE:
Leisure

Read More »

Llandissilio – WM3 Soil Assessment

CLIENT:
Jones Brothers

REMEDIATION STRATEGY:
Soils assessment

END USE:
Residential

Read More »

Newport Docks – WM3 assessment

CLIENT:
Jones Brothers

REMEDIATION STRATEGY:
Soils testing

CONTAMINATION:
N/A

END USE:
Industrial

Read More »

Shotley Gate, Ipswich – Site Investigation

CLIENT:
Wavensmere Homes / Galliard Homes

REMEDIATION STRATEGY:
Site Investigation

END USE:
Residential

Read More »

Asbestos in Soils Management – Ebbw Vale

CLIENT:
Jones Brothers (Henllan) Limited

REMEDIATION STRATEGY:
E-Clay Stabilisation, Asbestos in soil management

CONTAMINATION:
TPH, Asbestos

END USE:
Commercial

Read More »

Aston, Birmingham – Site Investigation

CLIENT:
Key Land Capital Ltd

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
N/A

END USE:
Commercial

Read More »

Two Sisters (Cavanagh & Grey) Carlise Site Investigation

CLIENT:
Meal Solutions (Two Sisters)

REMEDIATION STRATEGY:
SIte Investigation

CONTAMINATION:
N/A

END USE:
Food Manufacturing & Distribution

Read More »

Parc Trostre, Llanelli – Direct Transfer of Natural Soils under the CL:AIRE Code of Practice

CLIENT:
JBHL

REMEDIATION STRATEGY:
Direct transfer (natural soils)

CONTAMINATION:
None

END USE:
Acoustic bunds

Read More »

Northampton – Soil Assessment & Management

CLIENT:
ADI Group

REMEDIATION STRATEGY:
Material Management, Waste Recovery & Watching Brief

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Bromsgrove Road, Halesowen – Site Investigation, Tank Removal and Hydrocarbon Remediation

CLIENT:
N F Chancellor

REMEDIATION STRATEGY:
UST Removal and E-Clay stabilisation

CONTAMINATION:
Hydrocarbon

END USE:
Commercial

Read More »

Camden Street, Birmingham – Watching Brief, Soil Testing & Validation

CLIENT:
Kavannagh Construction

REMEDIATION STRATEGY:
Watching brief

CONTAMINATION:
Heavy metals

END USE:
Residential

Read More »

Baynton Road, Bristol – Site Investigation for a Residential Development

CLIENT:
Developments Bristol

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Belgrave Middleway, Birmingham – Site Investigation for a new Residential Development

CLIENT:
Confidential

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Atlantic Wharf, Cardiff (Second Phase) – Ground Investigation

CLIENT:
Robertson Construction

REMEDIATION STRATEGY:
Site Investigation

CONTAMINATION:
Not applicable

END USE:
Commercial

Read More »

Cefn Saeson School, Neath – E-Clay Stabilisation

CLIENT:
Prichard Holdings

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
TPH and heavy metals (lead and zinc)

END USE:
School

Read More »

Alveley, Shropshire – Surplus Soil Testing and WM3 Assessment

CLIENT:
Greyhound Homes

REMEDIATION STRATEGY:
Soil testing

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Ebbw Vale, South Wales – Soil WM3 assessment

CLIENT:
JBHL

REMEDIATION STRATEGY:
Soil testing

CONTAMINATION:
Not applicable

END USE:
Industrial

Read More »

Clydach, Swansea – Soil Assessment and Characterisation

CLIENT:
Trident Civil Engineering

REMEDIATION STRATEGY:
Soil characterisation

CONTAMINATION:
Not applicable

END USE:
Industrial

Read More »

Llanelli, Camarthenshire – Soil Testing & WM3 Assessment

CLIENT:
JBHL

REMEDIATION STRATEGY:
WM3

CONTAMINATION:
Not applicable

END USE:
Commercial

Read More »

Cardiff Gate, Cardiff – Soil Tresting and WM3 assessment

CLIENT:
JBHL

REMEDIATION STRATEGY:
WM3 Assessment

CONTAMINATION:
None

END USE:
Commercial

Read More »

Minsterley, Shropshire – Remediation of Hydrocarbon Contamination

CLIENT:
TC Homes

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Herbert Road, Newport, Gwent – Soil Management under the CL:AIRE Code of Practice

CLIENT:
Engie

REMEDIATION STRATEGY:
Material Management and Waste Recovery

CONTAMINATION:
Metals, hydrocarbons and asbestos

END USE:
Residential

Read More »

Bromsgrove – E-Clay Stabilisation of Hydrocarbon Contamination

CLIENT:
DES (Demolition)

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Site Investigation All Saints Garage, Bromsgrove

CLIENT:
DES (Demolition)

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Bridgend – Parc Afon Regeneration

CLIENT:
Bridgend Council

REMEDIATION STRATEGY:
Site investigation Appraisal

CONTAMINATION:
Not applicable

END USE:
Mixed

Read More »

Crocketts Lane, Smethwick – Clean Cover Validation

CLIENT:
Deeble Ventures Two Ltd

REMEDIATION STRATEGY:
Clean Cover Validation

CONTAMINATION:
N/A

Read More »

Sansome Walk, Worcester – Site Investigation

CLIENT:
Gleeds

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Hereford – Ground Gas Monitoring

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Medical

Read More »

Fleetwood Oil Recycling Facility – Site Investigation

CLIENT:
Castle Environmental

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Industrial

Read More »

Lichfield – Site Investigation

CLIENT:
Key Land Capital

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Commercial

Read More »

Chesterfield Road, Lichfield – Site Investigation

CLIENT:
Key Land Capital

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Media City, Salford – Site Investigation

CLIENT:
Bouygoes

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Mixed

END USE:
Residential

Read More »

Iver – Groundwater Monitoring

CLIENT:
Colonade Construction

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Metals and hydrocabons

END USE:
Industrial

Read More »

Dumballs Road, Cardiff – Site Investigation

CLIENT:
Bellerophon

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Mixed

Read More »

Beorma Quarter, Birmingham – Ground Investigation

CLIENT:
Gleeds

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Ground Investigation Castings, Cannock

CLIENT:
Seddons

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Industrial

Read More »

Site investigation – Lunar Rise, Birmingham

CLIENT:
Gleeds

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Residential

Read More »

Ground investigation Moor Lane, Old Hill

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Residential Care Home

Read More »

Ground investigation & remediation Stoke Ferry

CLIENT:
Chalcroft

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Asbestos and PERC

END USE:
Residential

Read More »

Groundwater site investigation Northampton

CLIENT:
KWB

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
TCE and IPA

END USE:
Commercial / industrial

Read More »

Soils testing, Glenside, Newport

CLIENT:
Jones Brothers (Henllan) Ltd

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Commercial

Read More »

Ground Investigation Landfill

CLIENT:
Site owners

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Not applicable

Read More »

Site investigation Barry Docks

CLIENT:
Cuddy Group

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Not applicable

Read More »

Site Investigation Waterton Road, Bridgend

CLIENT:
Site owners

REMEDIATION STRATEGY:
Site investigation

CONTAMINATION:
Not applicable

END USE:
Not applicable

Read More »

Hydrocarbon Remediation Ford Bridgend

CLIENT:
Arcadis

REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Site Investigation & Remediation Former Garage, Alveley

CLIENT:
Greyhound Homes

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
TPH, BTEX

END USE:
Residential

Read More »

Ground investigation, Atlantic Wharf, Cardiff

CLIENT:
Cardiff City Council

REMEDIATION STRATEGY:
Ground Investigation

CONTAMINATION:
Not applicable

END USE:
Leisure

Read More »

Soil Management Plan Olive Primary School

CLIENT:
Bouygues UK

REMEDIATION STRATEGY:
Waste classification, soil management

CONTAMINATION:
TPH, PAH, Heavy Metals

END USE:
School

Read More »

Groundwater Remediation at the former Newbury Gas Works

CLIENT:
Cognition Land and Water

REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB) & Low Permeability Barrier

CONTAMINATION:
BTEX, TPH, PAH Phenols, ammonia, cyanide, heavy metals

END USE:
Residential

Read More »

Site Investigation Somerset

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
Supplementary SI, DQRA

CONTAMINATION:
TPH, PAH, Heavy Metals

END USE:
Leisure

Read More »

Oil Spill Bus Station, Porth

CLIENT:
Stagecoach

REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

JKW management Coventry

CLIENT:
Gleeds

REMEDIATION STRATEGY:
Japanese Knotweed Management, Reduced Level Dig, Site Investigation, Off site soil disposal, watching brief

CONTAMINATION:
TPH, PAHs, Japanese Knotweed

END USE:
Residential

Read More »

TCE & Cr(VI) remediation Sheepbridge

CLIENT:
Confidential

REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing and general earthworks

CONTAMINATION:
TPH, PAH, TCE and Chromium VI

END USE:
Commercial

Read More »

Materials management (soils) Castings, Brownhills

CLIENT:
Seddon Construction

REMEDIATION STRATEGY:
Material management, JKW & enabling works

CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & JKW

END USE:
Commercial

Read More »

Enabling works and surplus soils removal – Media City Plot D1

CLIENT:
Bouygues UK

REMEDIATION STRATEGY:
Materials Management & Watching brief

CONTAMINATION:
TPH, PAH & Heavy Metals

END USE:
Residential & Retail

Read More »

Low permeability barrier (cut-off wall) Sheffield

CLIENT:
Cognition Land and Water

REMEDIATION STRATEGY:
Low Permeability Barrier

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Marine Sediment E-Clay stabilisation Killybegs Harbour.

CLIENT:
DAFM

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Tributyl Tin, TPH, Heavy Metals

END USE:
Commercial

Read More »

Petrol Station Remediation Sutton Coldfield

CLIENT:
Co-op Stores

REMEDIATION STRATEGY:
Demolition, UST removal, E-Clay stabilisation, PRB installation

CONTAMINATION:
TPH

END USE:
Retail

Read More »

Cut-off wall Former Fuel Depot, Portsmouth

CLIENT:
Homes England

REMEDIATION STRATEGY:
Low Permeability Barrier

CONTAMINATION:
TPH, PAH, VOCs

END USE:
Residential and commercial

Read More »

Hub & Cluster Site, Swindon

CLIENT:
Swindon Borough Council

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Landscaping Bunds

Read More »

Cr (VI) Remediation Roade Northamptonshire

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Ex-Situ E-Clay stabilisation

CONTAMINATION:
Hexavalent Chromium

END USE:
Residential

Read More »

Source Treatment – Pershore Street, Birmingham

CLIENT:
Thomas Vale (Bouygues)

REMEDIATION STRATEGY:
E-Clay stabilisation, material management and enabling works

CONTAMINATION:
Heavy metals

END USE:
Residential

Read More »

Hydrocarbon Remediation JCB Uttoxter

CLIENT:
JCB

REMEDIATION STRATEGY:
Integrated E-Clay Stabilisation, E-Clay Permeable Reactive Barrier, asbestos amanagement and material management.

CONTAMINATION:
Total Petroleum Hydrocarbon, Polycyclic Aromtaic Hydocarbon and asbestos

END USE:
Residential

Read More »

Source Treatment Bartoline Factory, Beverley

CLIENT:
CR Reynolds (Construction)

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Flood Defence – River Embankment, Goole

CLIENT:
Environment Agency

REMEDIATION STRATEGY:
Low permeability barrier

CONTAMINATION:
Flood defence

END USE:
Flood defence

Read More »

Waste Soils Recovery – Stewart Park Middlesbrough

CLIENT:
Middlesbrough Council

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Heavy metals & Hydrocarbon (TPH)

END USE:
Leisure

Read More »

Permeable Reactive Barrier Stockton-on-Tees

CLIENT:
Homes & Communities Agency

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Commercial

Read More »

Permeable Reactive Barrier Lambton Coking Works

CLIENT:
Homes & Communities Agency

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Ammonia

END USE:
Residential

Read More »

Permeable Reactive Barrier Cumbria

CLIENT:
Homebase

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Tributyl Tin

END USE:
Commercial

Read More »

PRB Appleby

CLIENT:
T. A Millard (Scotland)

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
PAHs, Ammoniacal Nitrogen, BTEX, Phenols, Heavy Metals

END USE:
Commercial

Read More »

Hydrocarbon Remediation New Stevenston, Lanarkshire

CLIENT:
Robertson Homes

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Heavy metals & Hydrocarbons (TPH & PAH)

END USE:
Residential

Read More »

Source Treatment Cathcart Place, Rutherglen

CLIENT:
South Lanarkshire Council

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilsation

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Soil Remediation Cambuslang Road, Glasgow

CLIENT:
Lidl

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Enabling works

CONTAMINATION:
Hydrocarbon (VOC, TPH & PAH) & Asbestos

END USE:
Retail

Read More »

Gasworks remediation Dalmarnock Road, Rutherglen

CLIENT:
Clyde Gateway

REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation.

CONTAMINATION:
Gas works waste (cyanides, heavy metals & hydrocarbons (PAH & TPH)

END USE:
Not known

Read More »

Hydrocarbon Remediation Glasgow

CLIENT:
Clyde Gateway

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Gasworks Remediation Kingston Yard, Port Glasgow

CLIENT:
Highmoor Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
Heavy Metals, TPH, PAHs, Cyanide

END USE:
Residential

Read More »

Gasworks Remediation, Eshiels

CLIENT:
Scottish Borders Council

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, BTEX, Heavy Metals, Phenols,, PAHs

END USE:
Waste Transfer Station

Read More »

Gasworks remediation St Rules, St Andrews

CLIENT:
Confidential

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation, E-Clay Permeable Reactive Barrier and low permeability barrier

CONTAMINATION:
Gas works waste (Cyanide, metals, PAH, ammonia & TPH)

END USE:
Residential

Read More »

Source Treatment Macalpine Road, Dundee

CLIENT:
Lidl

REMEDIATION STRATEGY:
Ex-Situ E-Clay Stabilisation

CONTAMINATION:
TPH

END USE:
Retail

Read More »

Remediation of TPH, Bridge of Earn, Perth

CLIENT:
Perthshire Housing Association

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Soil Remediation Former ICI Detonators Site

CLIENT:
I&H Brown

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation

CONTAMINATION:
Mercury Fulminate and Lead Azide

END USE:
Residential

Read More »

Soil Management Bathgate

CLIENT:
Taylor Wimpey

REMEDIATION STRATEGY:
Stockpile removal, reduced level dig and offsite disposal

CONTAMINATION:
Asbestos

END USE:
Residential

Read More »

Permeable Reactive Barrier Airdrie

CLIENT:
Keller Ground Engineering

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Heavy Metals, Ammonia, Cyanide, TPH, PAHs,

END USE:
Commercial

Read More »

Offsite Disposal Rutherglen

CLIENT:
Dawn Homes

REMEDIATION STRATEGY:
Reduced level dig, offsite disposal and treatment of JKW

CONTAMINATION:
Chromium VI and JKW

Read More »

Cr (VI) groundwater remediation Muirend Playing Fields, Glasgow

CLIENT:
East Renfrewshire Council

REMEDIATION STRATEGY:
E-Clay PRB

CONTAMINATION:
Heavy metals (CrVI)

END USE:
Leisure

Read More »

E-Clay stabilisation, Kilmarnock

CLIENT:
Confidential

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, BTEX

END USE:
Residential

Read More »

Oil Spill, Newcastle upon Tyne

CLIENT:
Confidential

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH (Heating Oil)

END USE:
Residential

Read More »

Gasworks remediation Guisborough

CLIENT:
Cundall, Johnstone & Partners

REMEDIATION STRATEGY:
E-Clay Stabilisation and underground tank removal

CONTAMINATION:
TPH, PAHs, Ammonia

END USE:
Car Parking

Read More »

E-Clay stabilisation of gas works waste

CLIENT:
Keigar Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, Cyanide

END USE:
Residential

Read More »

E-Clay Stabilisation Crowle

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs

END USE:
Commercial (some residential)

Read More »

Source Treatment Pudsey

CLIENT:
Professional Remediation

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Residential

Read More »

E-Clay stabilisation Bradford

CLIENT:
Consort Homes (Northern)

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs

END USE:
Residential

Read More »

Remediation of Gas Works, Middleton

CLIENT:
BAM Nuttall

REMEDIATION STRATEGY:
in-situ & ex-situ E-Clay Stabilisation

CONTAMINATION:
Ammonia, TPH, PAHs, Phenol

END USE:
Commercial

Read More »

Gas Works Remediation Stockport

CLIENT:
Matalan

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Heavy Metals, Phenol, Ammonia, BTEX, PAHs

END USE:
Retail

Read More »

Source Treatment Mansfield

CLIENT:
Ben Bailey Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH

END USE:
Residential

Read More »

E-Clay Stabilisation Matlock

CLIENT:
Birse Civils

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs

END USE:
Commercial

Read More »

Blue Billy treatability trials Harpurhey

CLIENT:
Manchester City Council

REMEDIATION STRATEGY:
Treatability trials

CONTAMINATION:
Gas Works Waste (iron cyanide compounds)

END USE:
Open space

Read More »

Gould Street, Manchester Gasworks remediation

CLIENT:
National Grid

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
Gas Works Waste (iron cyanides, phenols, TPH, PAH and ammonia)

END USE:
Statutory remediation

Read More »

Enabling works and surplus soils removal – Media City Plot C1

CLIENT:
Bouygues

REMEDIATION STRATEGY:
Watching brief and soil management

CONTAMINATION:
TPH, PAH & Heavy Metals

END USE:
Residential & Retail

Read More »

E-Clay stabilisation Handforth

CLIENT:
McLean Homes

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH, BTEX

END USE:
Residential

Read More »

E-Clay stabilisation Ollerton

CLIENT:
Encia Terracare

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
BTEX, TPH, PAHs, Phenol, Ammonia

END USE:
Residential

Read More »

Watching Brief Burslem College

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Site investigation, Material management Capping validation

CONTAMINATION:
Asbestos, Heavy metals & Hydrocarbons (TPH & PAH)

END USE:
Educational

Read More »

Site Investigation Caulden Campus Stoke

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Site investigation, Material management & Capping validation

CONTAMINATION:
Heavy metals, Hydrocarbon (TPH & PAH) & Asbestos

END USE:
Educational

Read More »

E-Clay Stabilisation Woore

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH, BTEX

END USE:
Residential

Read More »

Canal repair works – Shropshire Union Canal

CLIENT:
British Waterways

REMEDIATION STRATEGY:
In-situ stabilisation

CONTAMINATION:
Not applicable

END USE:
Leisure

Read More »

E-Clay Stabilisation Tamworth

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Hydrocarbon Remediation Lichfield

CLIENT:
Galliford Try

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Groundwater treatment

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Residential

Read More »

Hydrocarbon Remediation Walsall

CLIENT:
Confidential

REMEDIATION STRATEGY:
E-Clay stabilisation

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Residential

Read More »

E-Clay Stabilisation (Trichloroethene), Roade

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
TCE

END USE:
Residential

Read More »

E-Clay Stabilisation Hitchin

CLIENT:
Redrow Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, Heavy Metals

END USE:
Residential

Read More »

E-Clay Stabilisation Cook’s Shipyard

CLIENT:
Bryant Homes

REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, Heavy Metals

END USE:
Residential

Read More »

Permeable Reactive Barrier in Colchester

CLIENT:
Insight Investments

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Free Phase Product Removal

CONTAMINATION:
TPH

END USE:
Commercial / Retail

Read More »

E-Clay Stabilisation Cranes Ipswich

CLIENT:
Cranes Fluid Systems

REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, heavy Metals

END USE:
Commercial

Read More »

Remediation Petrol Station Kings Lynn

CLIENT:
Freebridge Community Housing

REMEDIATION STRATEGY:
Tank removal, ex-situ E-Clay stabilisation & low permeability barrier

CONTAMINATION:
Former Petrol Filling Station (Hydrocarbons)

END USE:
Residential

Read More »

Remediation Gayton

CLIENT:
Chalcroft

REMEDIATION STRATEGY:
Site investigation, treatability trials, gas monitoring, tank removal, and E-Clay stabilisation.

CONTAMINATION:
TPH, Pesticides and Herbicides

END USE:
Residential

Read More »

Elemental Mercury Remediation RAF Lakenheath

CLIENT:
Vinci

REMEDIATION STRATEGY:
Source removal & Material management

CONTAMINATION:
Mercury

END USE:
Commercial

Read More »

Stamford Gas Works Remediation

CLIENT:
Ashmill Building Integrity

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Gas works waste (Ammonia, cyanide, TPH & PAH)

END USE:
Residential

Read More »

PRB Harvey Reeves Ransome Road Landfill

CLIENT:
English Partnerships

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHS, Ammonia, Heavy Metals, Ammonia

END USE:
Commercial

Read More »

E-Clay Stabilisation Leicester

CLIENT:
Leicester City Council

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification, free product removal

CONTAMINATION:
TPH, PAHs

END USE:
Educational

Read More »

Permeable Reactive Barrier Kirby Muxloe

CLIENT:
Crown Crest (Leicester) PLC

REMEDIATION STRATEGY:
E-Clay PRB

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

E-Clay Stabilisation Nuneaton

CLIENT:
Bryant Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Watching Brief Coventry

CLIENT:
Trebor Developments

REMEDIATION STRATEGY:
Material management

CONTAMINATION:
Hydrocarbon (PAH & TPH), Heavy metals and Asbestos

END USE:
Commercial

Read More »

Watching brief & offsite disposal Coventry

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Material management

CONTAMINATION:
Hydrocarbons (TPH & PAH) & Asbestos

END USE:
School

Read More »

Materials management Coventry

CLIENT:
Thomas Vale Constrcution

REMEDIATION STRATEGY:
Material management & Japanese Knot Weed

CONTAMINATION:
Heavy metals, TPH, asbestos & Japanese Knot Weed

END USE:
Educational

Read More »

Integrated remediation strategy Coleshill

CLIENT:
Tame Construction

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHs

END USE:
Commercial

Read More »

TCE & TPH Remediation Birmingham

CLIENT:
Midland Heart

REMEDIATION STRATEGY:
Ex-situ & In-situ E-Clay stabilisation & PRB

CONTAMINATION:
Hydrocarbon (TCE & TPH)

END USE:
Residential

Read More »

Soil Management Birmingham

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Material management & Gas protection / capping validation

CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos

END USE:
Educational

Read More »

Integrated remediation strategy Birmingham

CLIENT:
Chase Midland Estates

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Permeable Reactive Barrier

CONTAMINATION:
TPH

END USE:
Retail

Read More »

Integrated remediation strategy Edgbaston

CLIENT:
Homes & Communities Agency

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection validation

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Residential

Read More »

Hydrocarbon Contamination Remediation – Mill Street, Tipton

CLIENT:
MarCity Homes

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Residential

Read More »

Consultancy & JKM Management Four Crosses, Staffordshire

CLIENT:
Baynham Meikle Partnership

REMEDIATION STRATEGY:
JKW eradication, Site Investigation and Environmental Risk Assessment

CONTAMINATION:
JKW, TPH and Spent Oxide (Landfill)

END USE:
Commercial

Read More »

Materials Management – Former Springfield Brewery, Wolverhampton

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Watching Brief, Materials Management

CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos

END USE:
Educational

Read More »

Soil & Groundwater Remedaition Wolverhampton

CLIENT:
Seconique

REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing, tank removal, drainage, installation of gas membrane and new floor slab

CONTAMINATION:
TPH, Chromium VI, TCE and PERC

END USE:
Commercial (Retail and storage)

Read More »

Chlorinated Hydrocarbon Remediation Budbrooke Point, Warwick

CLIENT:
Chase Commercial

REMEDIATION STRATEGY:
In-situ E-clay stabilisation & PRB

CONTAMINATION:
Hydrocarbons (VOC, PAH & TPH)

END USE:
Commercial

Read More »

Warwick Gas Works Remediation, Ansell Way, Saltisford

CLIENT:
George Wimpey

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
BTEX, TPH, PAH, Heavy Metals,

END USE:
Residential

Read More »

Japanese Knotweed Management

CLIENT:
Thomas Vale Construction

REMEDIATION STRATEGY:
Japanese Knotweed Removal

CONTAMINATION:
Japanese Knotweed

END USE:
Residential

Read More »

Hydrocarbon Remediation

CLIENT:
Speller Metcalfe

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation

CONTAMINATION:
Hydrocarbon (TPH & PAH)

END USE:
Commercial

Read More »

Tar Lagoon Remediation

CLIENT:
Wrexham Borough Council

REMEDIATION STRATEGY:
ex situ E-Clay Stabilisation

CONTAMINATION:
TPH, PAHs, BTEX, Cyanide, Phenols, Heavy Metals

END USE:
None

Read More »

Gas Works Remediation

CLIENT:
Barratt Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, Spent Oxide (Blue Billy), BTEX, Phenol

END USE:
Residential

Read More »

Integrated remediation of former petrol filling station (Sandon).

CLIENT:
Anderson Group

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection / capping validation

CONTAMINATION:
Former PFS (TPH)

END USE:
Residential

Read More »

E-Clay Stabilisation Chelmsford

CLIENT:
Barratt Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, Phenols, Heavy Metals,

END USE:
Residential

Read More »

Remediation works at Tilbury Docks

CLIENT:
SSE

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
Heavy metals & Hydrocarbon (TPH & PAH)

END USE:
Commercial

Read More »

Petrol Station Remediation

CLIENT:
Anderson Group

REMEDIATION STRATEGY:
Tank removal / validation, Ex-situ E-Clay stabilisation & PRB

CONTAMINATION:
TPH & Naphthalene

END USE:
Residential

Read More »

Chlorinated Hydrocarbon Remediation

CLIENT:
Confidential

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
VOCs & SVOCs

END USE:
Residential

Remediation of Blue Billy contaminated soils at Tondu

CLIENT:
Jehu

REMEDIATION STRATEGY:
E-Clay stabilisation

CONTAMINATION:
Spent Oxide (free / complex cyanide)

END USE:
Residential

Read More »

Remediation works for the treatment of waste at Vale Refinery, Clydach

CLIENT:
Vale Refinery

REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)

CONTAMINATION:
Heavy metals and hydrocarbon

END USE:
Commercial

Read More »

Remediation works Swansea

CLIENT:
Jone Brothers (Henllan) ltd

REMEDIATION STRATEGY:
Site investigation and offsite disposal to Treatment Hub

CONTAMINATION:
TPH and PAH

END USE:
Residential

Read More »

Remediation works (Hub & Cluster) Llanelli

CLIENT:
Gwalia

REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation

CONTAMINATION:
PAH, heavy metals, asbestos & JKW

END USE:
Residential

Read More »

Stabilisation of Hydrocarbon Contaminantion

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, PAHs, BTEX

END USE:
Residential

Read More »

Chlorinated Hydrcarbon Remediation

CLIENT:
The London Borough of Barking & Dagenham

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Chlorinated Hydrocarbons

END USE:
Commercial

Read More »

E-Clay Stabilisation Walthamstow

CLIENT:
Family Housing Association

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
Heavy Metals, PAHs

END USE:
Residential

Read More »

Permeable Reactive Barrier Bow

CLIENT:
Henley Homes

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAH, Phenol, VOCs

END USE:
Residential

Read More »

Remediation works at former landfill Barking Riverside

CLIENT:
Barking Riverside

REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, PRB & low permeability barrier

CONTAMINATION:
Spent oxide (Cyanides), heavy metals, Hydrocarbons (TPH & PAH) & Ammonia

END USE:
Residential and other

Read More »

E-Clay Stabilisation Beckton

CLIENT:
London Development Agency / Thames Gateway

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide

END USE:
Residential

Read More »

Integrated Remediation Strategy Bromley-by-Bow

CLIENT:
ProLogis

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHs, Cyanide, Ammonia

END USE:
Commercial

Read More »

Remediation works (PRB) at Royal Wharf

CLIENT:
Cognition Land and Water (Ballymore Group & Oxley Holding)

REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB)

CONTAMINATION:
Heavy metals

END USE:
Residential

Read More »

Permeable Reactive Barrier Isle of Dogs

CLIENT:
The Odyssey

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAH, BTEX, Heavy Metals

END USE:
Residential

Read More »

E-Clay Stabilisation Greenwich

CLIENT:
Bellway Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
BTEX, Naphthalene

END USE:
Residential

Read More »

Permeable Reactive Barrier Bermondsey

CLIENT:
Mansell Construction

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Heavy Metals, PAHs

END USE:
Residential

Read More »

Permeable Reactive Barrier Purley Way

CLIENT:
Barratt Homes

REMEDIATION STRATEGY:
E-Clay Permeable Reactive barrier

CONTAMINATION:
BTEX, PAHs, TPH, Heavy Metals, Ammonia, Cyanide, Phenols

END USE:
Residential

Read More »

E-Clay Stabilisation Kew Riverside Richmond

CLIENT:
Barratt Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
PAHs, Heavy Metals

END USE:
Residential

Read More »

Integrated Remdiation Strategy Uxbridge

CLIENT:
Galliford Try

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHs

END USE:
Residential

Read More »

Integrated Remediation Strategy West Drayton

CLIENT:
Acton Housing

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier, ex-situ E-Clay stabilisation / solidification

CONTAMINATION:
BTEX, Solvents, Chlorinated Hydrocarbons

END USE:
Residential

Read More »

Permeable Reactive Barrier at Walton-on-Thames (PRB)

CLIENT:
Willmott Dixon

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAH & ammonia

END USE:
Leisure

Read More »

Remediation works (E-Clay PRB) at Harmondsworth

CLIENT:
Kingswood Commercial Developments

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
Chlorinated Hydrocarbons

END USE:
Commercial

Read More »

Bentonite cut off wall at Dorney Lake, Dorney

CLIENT:
Eton College

REMEDIATION STRATEGY:
Low Permeability Groundwater Barrier

CONTAMINATION:
Designed to reduce draining of lake

END USE:
Rowing Lake

Read More »

Remediation works at former gas works Maidstone

CLIENT:
FC Property Management

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation & E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHs, Heavy Metals, Ammonia, Cyanide, Phenol

END USE:
Retail

Read More »

Remediation works West Kent Cold Store, Dunton Green

CLIENT:
Berkeley Homes

REMEDIATION STRATEGY:
E-Clay PRB & Low permeability barrier

CONTAMINATION:
TPH, PAHs

END USE:
Residential

Read More »

Remediation works (E-Clay stabilisation) at Chineham

CLIENT:
Laing Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
TPH, Heavy Metals

END USE:
Residential

Read More »

Remediation works (permeable reactive barrier) at Astolat Estate, Guildford

CLIENT:
QDS

REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier

CONTAMINATION:
TPH, PAHs

END USE:
Commercial

Read More »

Remediation works at Hills Farm Lane, Horsham

CLIENT:
Osborne Homes

REMEDIATION STRATEGY:
E-Clay Stabilisation using Wirtgen

CONTAMINATION:
Heavy Metals, PAHs

END USE:
Residential

Read More »

Remediation works (bioremediation) at Bishop’s Waltham

REMEDIATION STRATEGY:
Bioremediation

CONTAMINATION:
TPH, PAHs

END USE:
Residential

Read More »

Remediation works at former Tannery site Milbourne Port

CLIENT:
Ford Civil Engineering

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
Heavy Metals (arsenic, cadmium & chromium)

END USE:
Residential

Read More »

Remediation works of former gas works site Isle of Wight

CLIENT:
River Yar Boatyard

REMEDIATION STRATEGY:
E-Clay PRB

CONTAMINATION:
Heavy metals, cyanide, TPH & PAH

END USE:
Commercial

Read More »

Remediation works of former Pitwines Gas Works (Poole)

CLIENT:
Crest Nicholson

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide, Phenol, Ammonia

END USE:
Residential

Read More »

Remediation works of former Gales Saw Mill, Moretonhampstead

CLIENT:
Stevens Homes

REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification

CONTAMINATION:
PAHs, Heavy Metals

END USE:
Residential

Read More »

Remediation works of former tar tank base at oil / fuel facility Plymouth

CLIENT:
Greenergy

REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, material management

CONTAMINATION:
TPH, PAH and asbestos (fibres and ACM)

END USE:
Commercial

Read More »

Remediation of hydrocarbon contaminated soils

CLIENT:
Maxol

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
BTEX, TPH

END USE:
Residential

Read More »

Remediation works of contaminated soils from Kent Station Co Cork

CLIENT:
Atlas Environmental

REMEDIATION STRATEGY:
E-Clay Stabilisation and bioremediation

CONTAMINATION:
Heavy Metals, DOC

END USE:
Disposal to landfill as INERT waste

Read More »

Remediation of hydrocarbon and heavy metal impacted soils by E-Clay stabilisation.

CLIENT:
Laoise Sawmills

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH

END USE:
Commercial

Read More »

Remediation works Waterford

CLIENT:
David Flynn Limited

REMEDIATION STRATEGY:
E-Clay Stabilisation

CONTAMINATION:
TPH

END USE:
Residential

Read More »

Hydrocarbon Remediation Waterford

CLIENT:
Aldi

REMEDIATION STRATEGY:
in-situ E-Clay Stabilisation & bioremediation

CONTAMINATION:
TPH

END USE:
Supermarket Development

Read More »

Remediation works of contaminated (TBT) marine dredged sediments for reuse as engineering fill Mylor Harbour

CLIENT:
Mylor Yacht Harbour

REMEDIATION STRATEGY:
E-Clay treatment of marine sediments

CONTAMINATION:
TriButyl Tin (TBT)

END USE:
Commercial

Read More »

Remediation works of heavy metal waste to enable reuse at Vale Refinery, Clydach (2010/11)

CLIENT:
Vale Refinery

REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)

CONTAMINATION:
Heavy metals (nickel & copper)

END USE:
Commercial

Read More »

Remediation works associated with former scrap yard, Pyle

CLIENT:
Celtic Recycling

REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB

CONTAMINATION:
TPH, PAHs

END USE:
Commercial

Read More »

Integrated remediation works of former industrial site, Bromsgrove

CLIENT:
Chase Commercial

REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation, PRB & Material management

CONTAMINATION:
TPH, PAHs

END USE:
Retail

Read More »

Bioremediation Scunthorpe

CLIENT:
MFM Developments

REMEDIATION STRATEGY:
Bioremediation

CONTAMINATION:
TPH, PAH (including naphthalene)

END USE:
Residential

Read More »

Japanese Knotweed Management Clent

CLIENT:
Lodge Park Limited

REMEDIATION STRATEGY:
Japanese Knotweed Management / Removal

CONTAMINATION:
Japanese Knotweed

END USE:
Residential

Read More »

Remediation works of former industrial site Coventry

CLIENT:
Persimmon Homes

REMEDIATION STRATEGY:
E-Clay stabilisation

CONTAMINATION:
Total Petroleum Hydrocarbons and Tributyl Tin

END USE:
Residential

Read More »

Featured Case Studies

Port St Mary, Isle of Man – Remediation of a Former Gas Works

Envirotreat was commissioned by a local developer (Haven Homes) to […]

St Helier, Jersey – Gas Works Remediation

Envirotreat has been working with ROK for a number of […]

Redditch – PFAS Remediation

Envirotreat has been commissioned by Speller Metcalfe (PC for West […]

Atlantic Wharf, Cardiff (Second Phase) – Ground Investigation

Envirotreat was appointed by Robertson Construction to complete a second […]

Soil Management Plan Olive Primary School

Envirotreat was commissioned  by Bouygues UK to provide support (soil […]

Groundwater Remediation at the former Newbury Gas Works

Envirotrear was commissioned by Cognition Land & Water to undertake […]

Oil Spill Bus Station, Porth

Following an escape of heating oil (oil spill) at the […]

TCE & Cr(VI) remediation Sheepbridge

Envirotreat was commissioned by the landowner to design, gain regulatory approval […]

Materials management (soils) Castings, Brownhills

Envirotreat was commissioned by Sedon Group (on behalf of Castings […]

Enabling works and surplus soils removal – Media City Plot D1

The development lies immediately adjacent to the Manchester Ship Canal, […]

Source Treatment – Pershore Street, Birmingham

Site Background & History The site was located off Pershore […]

Hydrocarbon Remediation JCB Uttoxter

Site Background & History The former JCB Heavy Products Manufacturing […]

Delivering land you can develop

Envirotreat are a specialist remediation solution provider and sole providers of E-Clay technology