Niarbyl Cafe, Isle of Man – Environmental Consultancy Support
CLIENT:
Manx Heritage
REMEDIATION STRATEGY:
Off site disposal
CONTAMINATION:
TPH
END USE:
Commercial
New Inn Fire Station, Pontypool – PFAS Remediation
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Permeable Reactive Barrier
CONTAMINATION:
PFAS
END USE:
Commercial
Waun Gron, Cardiff – Site Investigation
CLIENT:
Wates
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Minsterley, Shropshire – Site Investigation
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
END USE:
Commercial
Canalside South, Wolverhampton – Site Investigation
CLIENT:
Wavensmere
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Soils Testing – Langstone Business Park, Havant
CLIENT:
ADI
REMEDIATION STRATEGY:
Soils testing
CONTAMINATION:
N/A
END USE:
Commercial
Site Investigation – Boden Mill, Chard
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Gas works
END USE:
Commercial
Phase 1 Desktop Study, Erdington, Birmingham
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
N/A
END USE:
Residential
Harborne, Birmingham – Remediation Method Statement & Validation
CLIENT:
Kiwi Design & Build
REMEDIATION STRATEGY:
Remediation Method Statement & Validation Report
END USE:
Residential
Groundwater Monitoring – Barking Riverside, London
CLIENT:
Barking Riverside
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Landfill
END USE:
Residential
Swansea, South Wales – Underground Tank Removal & Waste Management
CLIENT:
Confidential
REMEDIATION STRATEGY:
Underground Tank Removal & Waste Management
CONTAMINATION:
Hydrocarbon
END USE:
Residential
Speke, Liverpool – Stormwater interceptor tank replacement
CLIENT:
Confidential
REMEDIATION STRATEGY:
Interceptor replacement and offsite disposal
CONTAMINATION:
TPH
END USE:
Commercial
Site Investigation – Peel, Isle of Man
CLIENT:
Manx Utilities
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Hydrocarbon
END USE:
N/A
Oil Spill Investigation, St Saviour, Jersey
CLIENT:
DB Cummins
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
TPH
END USE:
Residential
Site Investigation – Former Gas Works, Port St Mary, Isle of Man
CLIENT:
Haven Homes
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Gas works waste
END USE:
Residential
Redditch Fire Station – PFAS Site Investigation
CLIENT:
Hereford and Worcester Fire and Rescue Service
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
PFAS
END USE:
Residential
Eastleigh – Site Investigation and MMP
CLIENT:
ADI
REMEDIATION STRATEGY:
Site Investigation and MMP
CONTAMINATION:
TPH, PAH and heavy metals
END USE:
Commercial
Havant – Ground Gas Risk Assessment
CLIENT:
ADI
REMEDIATION STRATEGY:
Gas monitoring
CONTAMINATION:
Brownfield Site
END USE:
Commercial
Poole – Ground gas assessment
CLIENT:
Confidential
REMEDIATION STRATEGY:
Ground gas investigation
CONTAMINATION:
Ground gas
END USE:
Residential
Hoddeston, Hertfordshire – Site Investigation
CLIENT:
Rawmech
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
TPH, PAH and heavy metals
END USE:
Commercial
Newbury – Site Investigation
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Frome, Somerset – Phase 1 Desk Study and Site Walkover Survey
CLIENT:
Paragon (a Colliers Company)
REMEDIATION STRATEGY:
Site Walkover
CONTAMINATION:
N/A
END USE:
Commercial
Swindon – Phase 1 Desk Study & Site Walkover Survey
CLIENT:
Paragon (a Colliers Company)
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
N/A
END USE:
Commercial
Abbots Bromley, Rugeley – Phase 1 & 2 Site Investigation
CLIENT:
AJ Associates
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Friar Gate Goods Yard, Derby – Site Investigation
CLIENT:
Wavensmere
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Metals
END USE:
Residential
Kidderminster – Site Investigation
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Brownfield Site
END USE:
Commercial
Fairview Mill, Edinburgh – Site Investigation
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Brownfield Site
END USE:
Commercial
Worcester University Teaching Block – Site Investigation
CLIENT:
Speller Metclafe
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Brownfield Site
END USE:
Educational
Princip Street, Birmingham – Site Investigation
CLIENT:
Kavannagh Construction
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Brownfield Site
END USE:
Residential
Hackney Wick, East London – Hydrocarbon Remediation
CLIENT:
O'Shea
REMEDIATION STRATEGY:
Excavation / disposal, E-Clay (Stabox) remediation, PRB, chemical oxidants groundwater treatment
CONTAMINATION:
TPH, PAHs and phenol
END USE:
Residential
Port St Mary, Isle of Man – Remediation of a Former Gas Works
CLIENT:
Haven HOmes
REMEDIATION STRATEGY:
in-situ & ex-situ E-Clay Stabilisation and PRB
CONTAMINATION:
Ammonia, TPH, PAHs, Phenol
END USE:
Residential
St Helier, Jersey – Gas Works Remediation
CLIENT:
ROK
REMEDIATION STRATEGY:
Integrated (E-Clay Stabilisation and PRB)
CONTAMINATION:
PAH, TPH and cyanide
END USE:
Residential with some commercial
Redditch – PFAS Remediation
CLIENT:
Speller Metclafe
REMEDIATION STRATEGY:
Integrated strategy involving PFASorb Stabilisation and an E-Clay Permeable Reactive Barrier
CONTAMINATION:
PFAS
END USE:
Police and Fire Combined Hub
Pontypool – Soil Management and Off Site Disposal
CLIENT:
Arcadis
REMEDIATION STRATEGY:
Offsite Disposal
CONTAMINATION:
Japanese Knotweed, heavy metals and hydrocarbons
END USE:
Industrial
Milford Mills, Derby – Site Investigation
CLIENT:
Wavensmere Homes
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Stoke Ferry, Norfolk – Remediation Works
CLIENT:
Chalcroft
REMEDIATION STRATEGY:
ACM Remediation
CONTAMINATION:
ACM
END USE:
Residential
The Gothic, Birmingham – Site Investigation
CLIENT:
Kavannagh Construction
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
N/A
END USE:
Residential
Wobaston Road, Wolverhampton – Soil Management & Off Site Disposal
CLIENT:
Seconique
REMEDIATION STRATEGY:
Offsite Disposal
CONTAMINATION:
Asbestos (ACM) and TPH / BaP
END USE:
Commercial / Industrial
St Clears, Camarthernshire – Soil Stockpile Analysis and WM3 Assessment
CLIENT:
JBHL
REMEDIATION STRATEGY:
Soils testing
CONTAMINATION:
Asbestos, TPH, Metals
END USE:
Residential
Forge Works, Biddulph – Site investigation
CLIENT:
Keyworker Homes
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
N/A
END USE:
Residential
Langstone Business Park, Havant – E-Clay Stabilisation
CLIENT:
ADI Building & Refurbishment
REMEDIATION STRATEGY:
E-Clay Stabilisation and watching brief
CONTAMINATION:
Hydrocarbon
END USE:
Commercial / industrial
Staines – E-Clay Stabilisation, New Aldi / Lock n Store development
CLIENT:
ADI Building & Refurbishment
REMEDIATION STRATEGY:
E-Clay Stabilisation & watching brief
CONTAMINATION:
Hydrocarbon
END USE:
Retail & commercial
Pembrey Racing Circuit / Gwynfaen – Transfer of Natural Soil to aid Housing Developments via DoWCoP
CLIENT:
Gower Plant
REMEDIATION STRATEGY:
Direct transfer of natural soils
CONTAMINATION:
N/A
END USE:
Leisure
Llandissilio – WM3 Soil Assessment
CLIENT:
Jones Brothers
REMEDIATION STRATEGY:
Soils assessment
END USE:
Residential
Newport Docks – WM3 assessment
CLIENT:
Jones Brothers
REMEDIATION STRATEGY:
Soils testing
CONTAMINATION:
N/A
END USE:
Industrial
Shotley Gate, Ipswich – Site Investigation
CLIENT:
Wavensmere Homes / Galliard Homes
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Asbestos in Soils Management – Ebbw Vale
CLIENT:
Jones Brothers (Henllan) Limited
REMEDIATION STRATEGY:
E-Clay Stabilisation, Asbestos in soil management
CONTAMINATION:
TPH, Asbestos
END USE:
Commercial
Aston, Birmingham – Site Investigation
CLIENT:
Key Land Capital Ltd
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
N/A
END USE:
Commercial
Two Sisters (Cavanagh & Grey) Carlise Site Investigation
CLIENT:
Meal Solutions (Two Sisters)
REMEDIATION STRATEGY:
SIte Investigation
CONTAMINATION:
N/A
END USE:
Food Manufacturing & Distribution
Parc Trostre, Llanelli – Direct Transfer of Natural Soils under the CL:AIRE Code of Practice
CLIENT:
JBHL
REMEDIATION STRATEGY:
Direct transfer (natural soils)
CONTAMINATION:
None
END USE:
Acoustic bunds
Northampton – Soil Assessment & Management
CLIENT:
ADI Group
REMEDIATION STRATEGY:
Material Management, Waste Recovery & Watching Brief
CONTAMINATION:
TPH
END USE:
Commercial
Bromsgrove Road, Halesowen – Site Investigation, Tank Removal and Hydrocarbon Remediation
CLIENT:
N F Chancellor
REMEDIATION STRATEGY:
UST Removal and E-Clay stabilisation
CONTAMINATION:
Hydrocarbon
END USE:
Commercial
Camden Street, Birmingham – Watching Brief, Soil Testing & Validation
CLIENT:
Kavannagh Construction
REMEDIATION STRATEGY:
Watching brief
CONTAMINATION:
Heavy metals
END USE:
Residential
Baynton Road, Bristol – Site Investigation for a Residential Development
CLIENT:
Developments Bristol
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Belgrave Middleway, Birmingham – Site Investigation for a new Residential Development
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Atlantic Wharf, Cardiff (Second Phase) – Ground Investigation
CLIENT:
Robertson Construction
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Cefn Saeson School, Neath – E-Clay Stabilisation
CLIENT:
Prichard Holdings
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH and heavy metals (lead and zinc)
END USE:
School
Alveley, Shropshire – Surplus Soil Testing and WM3 Assessment
CLIENT:
Greyhound Homes
REMEDIATION STRATEGY:
Soil testing
CONTAMINATION:
Not applicable
END USE:
Residential
Ebbw Vale, South Wales – Soil WM3 assessment
CLIENT:
JBHL
REMEDIATION STRATEGY:
Soil testing
CONTAMINATION:
Not applicable
END USE:
Industrial
Clydach, Swansea – Soil Assessment and Characterisation
CLIENT:
Trident Civil Engineering
REMEDIATION STRATEGY:
Soil characterisation
CONTAMINATION:
Not applicable
END USE:
Industrial
Llanelli, Camarthenshire – Soil Testing & WM3 Assessment
CLIENT:
JBHL
REMEDIATION STRATEGY:
WM3
CONTAMINATION:
Not applicable
END USE:
Commercial
Cardiff Gate, Cardiff – Soil Tresting and WM3 assessment
CLIENT:
JBHL
REMEDIATION STRATEGY:
WM3 Assessment
CONTAMINATION:
None
END USE:
Commercial
Minsterley, Shropshire – Remediation of Hydrocarbon Contamination
CLIENT:
TC Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Residential
Herbert Road, Newport, Gwent – Soil Management under the CL:AIRE Code of Practice
CLIENT:
Engie
REMEDIATION STRATEGY:
Material Management and Waste Recovery
CONTAMINATION:
Metals, hydrocarbons and asbestos
END USE:
Residential
Bromsgrove – E-Clay Stabilisation of Hydrocarbon Contamination
CLIENT:
DES (Demolition)
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Residential
Site Investigation All Saints Garage, Bromsgrove
CLIENT:
DES (Demolition)
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TPH
END USE:
Residential
Bridgend – Parc Afon Regeneration
CLIENT:
Bridgend Council
REMEDIATION STRATEGY:
Site investigation Appraisal
CONTAMINATION:
Not applicable
END USE:
Mixed
Crocketts Lane, Smethwick – Clean Cover Validation
CLIENT:
Deeble Ventures Two Ltd
REMEDIATION STRATEGY:
Clean Cover Validation
CONTAMINATION:
N/A
Sansome Walk, Worcester – Site Investigation
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Hereford – Ground Gas Monitoring
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Medical
Fleetwood Oil Recycling Facility – Site Investigation
CLIENT:
Castle Environmental
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Industrial
Lichfield – Site Investigation
CLIENT:
Key Land Capital
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Chesterfield Road, Lichfield – Site Investigation
CLIENT:
Key Land Capital
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Media City, Salford – Site Investigation
CLIENT:
Bouygoes
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Mixed
END USE:
Residential
Iver – Groundwater Monitoring
CLIENT:
Colonade Construction
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Metals and hydrocabons
END USE:
Industrial
Dumballs Road, Cardiff – Site Investigation
CLIENT:
Bellerophon
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Mixed
Beorma Quarter, Birmingham – Ground Investigation
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TPH
END USE:
Residential
Ground Investigation Castings, Cannock
CLIENT:
Seddons
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Industrial
Site investigation – Lunar Rise, Birmingham
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Ground investigation Moor Lane, Old Hill
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential Care Home
Ground investigation & remediation Stoke Ferry
CLIENT:
Chalcroft
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Asbestos and PERC
END USE:
Residential
Groundwater site investigation Northampton
CLIENT:
KWB
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TCE and IPA
END USE:
Commercial / industrial
Soils testing, Glenside, Newport
CLIENT:
Jones Brothers (Henllan) Ltd
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Ground Investigation Landfill
CLIENT:
Site owners
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Site investigation Barry Docks
CLIENT:
Cuddy Group
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Site Investigation Waterton Road, Bridgend
CLIENT:
Site owners
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Hydrocarbon Remediation Ford Bridgend
CLIENT:
Arcadis
REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub
CONTAMINATION:
TPH
END USE:
Commercial
Site Investigation & Remediation Former Garage, Alveley
CLIENT:
Greyhound Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Ground investigation, Atlantic Wharf, Cardiff
CLIENT:
Cardiff City Council
REMEDIATION STRATEGY:
Ground Investigation
CONTAMINATION:
Not applicable
END USE:
Leisure
Soil Management Plan Olive Primary School
CLIENT:
Bouygues UK
REMEDIATION STRATEGY:
Waste classification, soil management
CONTAMINATION:
TPH, PAH, Heavy Metals
END USE:
School
Groundwater Remediation at the former Newbury Gas Works
CLIENT:
Cognition Land and Water
REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB) & Low Permeability Barrier
CONTAMINATION:
BTEX, TPH, PAH Phenols, ammonia, cyanide, heavy metals
END USE:
Residential
Site Investigation Somerset
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Supplementary SI, DQRA
CONTAMINATION:
TPH, PAH, Heavy Metals
END USE:
Leisure
Oil Spill Bus Station, Porth
CLIENT:
Stagecoach
REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub
CONTAMINATION:
TPH
END USE:
Commercial
JKW management Coventry
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Japanese Knotweed Management, Reduced Level Dig, Site Investigation, Off site soil disposal, watching brief
CONTAMINATION:
TPH, PAHs, Japanese Knotweed
END USE:
Residential
TCE & Cr(VI) remediation Sheepbridge
CLIENT:
Confidential
REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing and general earthworks
CONTAMINATION:
TPH, PAH, TCE and Chromium VI
END USE:
Commercial
Materials management (soils) Castings, Brownhills
CLIENT:
Seddon Construction
REMEDIATION STRATEGY:
Material management, JKW & enabling works
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & JKW
END USE:
Commercial
Enabling works and surplus soils removal – Media City Plot D1
CLIENT:
Bouygues UK
REMEDIATION STRATEGY:
Materials Management & Watching brief
CONTAMINATION:
TPH, PAH & Heavy Metals
END USE:
Residential & Retail
Low permeability barrier (cut-off wall) Sheffield
CLIENT:
Cognition Land and Water
REMEDIATION STRATEGY:
Low Permeability Barrier
CONTAMINATION:
TPH
END USE:
Residential
Marine Sediment E-Clay stabilisation Killybegs Harbour.
CLIENT:
DAFM
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Tributyl Tin, TPH, Heavy Metals
END USE:
Commercial
Petrol Station Remediation Sutton Coldfield
CLIENT:
Co-op Stores
REMEDIATION STRATEGY:
Demolition, UST removal, E-Clay stabilisation, PRB installation
CONTAMINATION:
TPH
END USE:
Retail
Cut-off wall Former Fuel Depot, Portsmouth
CLIENT:
Homes England
REMEDIATION STRATEGY:
Low Permeability Barrier
CONTAMINATION:
TPH, PAH, VOCs
END USE:
Residential and commercial
Hub & Cluster Site, Swindon
CLIENT:
Swindon Borough Council
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Landscaping Bunds
Cr (VI) Remediation Roade Northamptonshire
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Ex-Situ E-Clay stabilisation
CONTAMINATION:
Hexavalent Chromium
END USE:
Residential
Source Treatment – Pershore Street, Birmingham
CLIENT:
Thomas Vale (Bouygues)
REMEDIATION STRATEGY:
E-Clay stabilisation, material management and enabling works
CONTAMINATION:
Heavy metals
END USE:
Residential
Hydrocarbon Remediation JCB Uttoxter
CLIENT:
JCB
REMEDIATION STRATEGY:
Integrated E-Clay Stabilisation, E-Clay Permeable Reactive Barrier, asbestos amanagement and material management.
CONTAMINATION:
Total Petroleum Hydrocarbon, Polycyclic Aromtaic Hydocarbon and asbestos
END USE:
Residential
Source Treatment Bartoline Factory, Beverley
CLIENT:
CR Reynolds (Construction)
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Commercial
Flood Defence – River Embankment, Goole
CLIENT:
Environment Agency
REMEDIATION STRATEGY:
Low permeability barrier
CONTAMINATION:
Flood defence
END USE:
Flood defence
Waste Soils Recovery – Stewart Park Middlesbrough
CLIENT:
Middlesbrough Council
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbon (TPH)
END USE:
Leisure
Permeable Reactive Barrier Stockton-on-Tees
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Commercial
Permeable Reactive Barrier Lambton Coking Works
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Ammonia
END USE:
Residential
Permeable Reactive Barrier Cumbria
CLIENT:
Homebase
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Tributyl Tin
END USE:
Commercial
PRB Appleby
CLIENT:
T. A Millard (Scotland)
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
PAHs, Ammoniacal Nitrogen, BTEX, Phenols, Heavy Metals
END USE:
Commercial
Hydrocarbon Remediation New Stevenston, Lanarkshire
CLIENT:
Robertson Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbons (TPH & PAH)
END USE:
Residential
Source Treatment Cathcart Place, Rutherglen
CLIENT:
South Lanarkshire Council
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilsation
CONTAMINATION:
TPH
END USE:
Commercial
Soil Remediation Cambuslang Road, Glasgow
CLIENT:
Lidl
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Enabling works
CONTAMINATION:
Hydrocarbon (VOC, TPH & PAH) & Asbestos
END USE:
Retail
Gasworks remediation Dalmarnock Road, Rutherglen
CLIENT:
Clyde Gateway
REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation.
CONTAMINATION:
Gas works waste (cyanides, heavy metals & hydrocarbons (PAH & TPH)
END USE:
Not known
Hydrocarbon Remediation Glasgow
CLIENT:
Clyde Gateway
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Commercial
Gasworks Remediation Kingston Yard, Port Glasgow
CLIENT:
Highmoor Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
Heavy Metals, TPH, PAHs, Cyanide
END USE:
Residential
Gasworks Remediation, Eshiels
CLIENT:
Scottish Borders Council
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, BTEX, Heavy Metals, Phenols,, PAHs
END USE:
Waste Transfer Station
Gasworks remediation St Rules, St Andrews
CLIENT:
Confidential
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation, E-Clay Permeable Reactive Barrier and low permeability barrier
CONTAMINATION:
Gas works waste (Cyanide, metals, PAH, ammonia & TPH)
END USE:
Residential
Source Treatment Macalpine Road, Dundee
CLIENT:
Lidl
REMEDIATION STRATEGY:
Ex-Situ E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Retail
Remediation of TPH, Bridge of Earn, Perth
CLIENT:
Perthshire Housing Association
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Soil Remediation Former ICI Detonators Site
CLIENT:
I&H Brown
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation
CONTAMINATION:
Mercury Fulminate and Lead Azide
END USE:
Residential
Soil Management Bathgate
CLIENT:
Taylor Wimpey
REMEDIATION STRATEGY:
Stockpile removal, reduced level dig and offsite disposal
CONTAMINATION:
Asbestos
END USE:
Residential
Permeable Reactive Barrier Airdrie
CLIENT:
Keller Ground Engineering
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, Ammonia, Cyanide, TPH, PAHs,
END USE:
Commercial
Offsite Disposal Rutherglen
CLIENT:
Dawn Homes
REMEDIATION STRATEGY:
Reduced level dig, offsite disposal and treatment of JKW
CONTAMINATION:
Chromium VI and JKW
Cr (VI) groundwater remediation Muirend Playing Fields, Glasgow
CLIENT:
East Renfrewshire Council
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
Heavy metals (CrVI)
END USE:
Leisure
E-Clay stabilisation, Kilmarnock
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Oil Spill, Newcastle upon Tyne
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH (Heating Oil)
END USE:
Residential
Gasworks remediation Guisborough
CLIENT:
Cundall, Johnstone & Partners
REMEDIATION STRATEGY:
E-Clay Stabilisation and underground tank removal
CONTAMINATION:
TPH, PAHs, Ammonia
END USE:
Car Parking
E-Clay stabilisation of gas works waste
CLIENT:
Keigar Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Cyanide
END USE:
Residential
E-Clay Stabilisation Crowle
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Commercial (some residential)
Source Treatment Pudsey
CLIENT:
Professional Remediation
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
E-Clay stabilisation Bradford
CLIENT:
Consort Homes (Northern)
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Remediation of Gas Works, Middleton
CLIENT:
BAM Nuttall
REMEDIATION STRATEGY:
in-situ & ex-situ E-Clay Stabilisation
CONTAMINATION:
Ammonia, TPH, PAHs, Phenol
END USE:
Commercial
Gas Works Remediation Stockport
CLIENT:
Matalan
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, Phenol, Ammonia, BTEX, PAHs
END USE:
Retail
Source Treatment Mansfield
CLIENT:
Ben Bailey Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
E-Clay Stabilisation Matlock
CLIENT:
Birse Civils
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Blue Billy treatability trials Harpurhey
CLIENT:
Manchester City Council
REMEDIATION STRATEGY:
Treatability trials
CONTAMINATION:
Gas Works Waste (iron cyanide compounds)
END USE:
Open space
Gould Street, Manchester Gasworks remediation
CLIENT:
National Grid
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
Gas Works Waste (iron cyanides, phenols, TPH, PAH and ammonia)
END USE:
Statutory remediation
Enabling works and surplus soils removal – Media City Plot C1
CLIENT:
Bouygues
REMEDIATION STRATEGY:
Watching brief and soil management
CONTAMINATION:
TPH, PAH & Heavy Metals
END USE:
Residential & Retail
E-Clay stabilisation Handforth
CLIENT:
McLean Homes
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH, BTEX
END USE:
Residential
E-Clay stabilisation Ollerton
CLIENT:
Encia Terracare
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
BTEX, TPH, PAHs, Phenol, Ammonia
END USE:
Residential
Watching Brief Burslem College
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Site investigation, Material management Capping validation
CONTAMINATION:
Asbestos, Heavy metals & Hydrocarbons (TPH & PAH)
END USE:
Educational
Site Investigation Caulden Campus Stoke
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Site investigation, Material management & Capping validation
CONTAMINATION:
Heavy metals, Hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
E-Clay Stabilisation Woore
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Canal repair works – Shropshire Union Canal
CLIENT:
British Waterways
REMEDIATION STRATEGY:
In-situ stabilisation
CONTAMINATION:
Not applicable
END USE:
Leisure
E-Clay Stabilisation Tamworth
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Hydrocarbon Remediation Lichfield
CLIENT:
Galliford Try
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Groundwater treatment
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Hydrocarbon Remediation Walsall
CLIENT:
Confidential
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
E-Clay Stabilisation (Trichloroethene), Roade
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
TCE
END USE:
Residential
E-Clay Stabilisation Hitchin
CLIENT:
Redrow Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Heavy Metals
END USE:
Residential
E-Clay Stabilisation Cook’s Shipyard
CLIENT:
Bryant Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Heavy Metals
END USE:
Residential
Permeable Reactive Barrier in Colchester
CLIENT:
Insight Investments
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Free Phase Product Removal
CONTAMINATION:
TPH
END USE:
Commercial / Retail
E-Clay Stabilisation Cranes Ipswich
CLIENT:
Cranes Fluid Systems
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, heavy Metals
END USE:
Commercial
Remediation Petrol Station Kings Lynn
CLIENT:
Freebridge Community Housing
REMEDIATION STRATEGY:
Tank removal, ex-situ E-Clay stabilisation & low permeability barrier
CONTAMINATION:
Former Petrol Filling Station (Hydrocarbons)
END USE:
Residential
Remediation Gayton
CLIENT:
Chalcroft
REMEDIATION STRATEGY:
Site investigation, treatability trials, gas monitoring, tank removal, and E-Clay stabilisation.
CONTAMINATION:
TPH, Pesticides and Herbicides
END USE:
Residential
Elemental Mercury Remediation RAF Lakenheath
CLIENT:
Vinci
REMEDIATION STRATEGY:
Source removal & Material management
CONTAMINATION:
Mercury
END USE:
Commercial
Stamford Gas Works Remediation
CLIENT:
Ashmill Building Integrity
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Gas works waste (Ammonia, cyanide, TPH & PAH)
END USE:
Residential
PRB Harvey Reeves Ransome Road Landfill
CLIENT:
English Partnerships
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHS, Ammonia, Heavy Metals, Ammonia
END USE:
Commercial
E-Clay Stabilisation Leicester
CLIENT:
Leicester City Council
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification, free product removal
CONTAMINATION:
TPH, PAHs
END USE:
Educational
Permeable Reactive Barrier Kirby Muxloe
CLIENT:
Crown Crest (Leicester) PLC
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
TPH
END USE:
Commercial
E-Clay Stabilisation Nuneaton
CLIENT:
Bryant Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Watching Brief Coventry
CLIENT:
Trebor Developments
REMEDIATION STRATEGY:
Material management
CONTAMINATION:
Hydrocarbon (PAH & TPH), Heavy metals and Asbestos
END USE:
Commercial
Watching brief & offsite disposal Coventry
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Material management
CONTAMINATION:
Hydrocarbons (TPH & PAH) & Asbestos
END USE:
School
Materials management Coventry
CLIENT:
Thomas Vale Constrcution
REMEDIATION STRATEGY:
Material management & Japanese Knot Weed
CONTAMINATION:
Heavy metals, TPH, asbestos & Japanese Knot Weed
END USE:
Educational
Integrated remediation strategy Coleshill
CLIENT:
Tame Construction
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
TCE & TPH Remediation Birmingham
CLIENT:
Midland Heart
REMEDIATION STRATEGY:
Ex-situ & In-situ E-Clay stabilisation & PRB
CONTAMINATION:
Hydrocarbon (TCE & TPH)
END USE:
Residential
Soil Management Birmingham
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Material management & Gas protection / capping validation
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
Integrated remediation strategy Birmingham
CLIENT:
Chase Midland Estates
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Permeable Reactive Barrier
CONTAMINATION:
TPH
END USE:
Retail
Integrated remediation strategy Edgbaston
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection validation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Hydrocarbon Contamination Remediation – Mill Street, Tipton
CLIENT:
MarCity Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Consultancy & JKM Management Four Crosses, Staffordshire
CLIENT:
Baynham Meikle Partnership
REMEDIATION STRATEGY:
JKW eradication, Site Investigation and Environmental Risk Assessment
CONTAMINATION:
JKW, TPH and Spent Oxide (Landfill)
END USE:
Commercial
Materials Management – Former Springfield Brewery, Wolverhampton
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Watching Brief, Materials Management
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
Soil & Groundwater Remedaition Wolverhampton
CLIENT:
Seconique
REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing, tank removal, drainage, installation of gas membrane and new floor slab
CONTAMINATION:
TPH, Chromium VI, TCE and PERC
END USE:
Commercial (Retail and storage)
Chlorinated Hydrocarbon Remediation Budbrooke Point, Warwick
CLIENT:
Chase Commercial
REMEDIATION STRATEGY:
In-situ E-clay stabilisation & PRB
CONTAMINATION:
Hydrocarbons (VOC, PAH & TPH)
END USE:
Commercial
Warwick Gas Works Remediation, Ansell Way, Saltisford
CLIENT:
George Wimpey
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
BTEX, TPH, PAH, Heavy Metals,
END USE:
Residential
Japanese Knotweed Management
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Japanese Knotweed Removal
CONTAMINATION:
Japanese Knotweed
END USE:
Residential
Hydrocarbon Remediation
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Commercial
Tar Lagoon Remediation
CLIENT:
Wrexham Borough Council
REMEDIATION STRATEGY:
ex situ E-Clay Stabilisation
CONTAMINATION:
TPH, PAHs, BTEX, Cyanide, Phenols, Heavy Metals
END USE:
None
Gas Works Remediation
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Spent Oxide (Blue Billy), BTEX, Phenol
END USE:
Residential
Integrated remediation of former petrol filling station (Sandon).
CLIENT:
Anderson Group
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection / capping validation
CONTAMINATION:
Former PFS (TPH)
END USE:
Residential
E-Clay Stabilisation Chelmsford
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Phenols, Heavy Metals,
END USE:
Residential
Remediation works at Tilbury Docks
CLIENT:
SSE
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbon (TPH & PAH)
END USE:
Commercial
Petrol Station Remediation
CLIENT:
Anderson Group
REMEDIATION STRATEGY:
Tank removal / validation, Ex-situ E-Clay stabilisation & PRB
CONTAMINATION:
TPH & Naphthalene
END USE:
Residential
Chlorinated Hydrocarbon Remediation
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
VOCs & SVOCs
END USE:
Residential
Remediation of Blue Billy contaminated soils at Tondu
CLIENT:
Jehu
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Spent Oxide (free / complex cyanide)
END USE:
Residential
Remediation works for the treatment of waste at Vale Refinery, Clydach
CLIENT:
Vale Refinery
REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)
CONTAMINATION:
Heavy metals and hydrocarbon
END USE:
Commercial
Remediation works Swansea
CLIENT:
Jone Brothers (Henllan) ltd
REMEDIATION STRATEGY:
Site investigation and offsite disposal to Treatment Hub
CONTAMINATION:
TPH and PAH
END USE:
Residential
Remediation works (Hub & Cluster) Llanelli
CLIENT:
Gwalia
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
PAH, heavy metals, asbestos & JKW
END USE:
Residential
Stabilisation of Hydrocarbon Contaminantion
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, BTEX
END USE:
Residential
Chlorinated Hydrcarbon Remediation
CLIENT:
The London Borough of Barking & Dagenham
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Chlorinated Hydrocarbons
END USE:
Commercial
E-Clay Stabilisation Walthamstow
CLIENT:
Family Housing Association
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Permeable Reactive Barrier Bow
CLIENT:
Henley Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH, Phenol, VOCs
END USE:
Residential
Remediation works at former landfill Barking Riverside
CLIENT:
Barking Riverside
REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, PRB & low permeability barrier
CONTAMINATION:
Spent oxide (Cyanides), heavy metals, Hydrocarbons (TPH & PAH) & Ammonia
END USE:
Residential and other
E-Clay Stabilisation Beckton
CLIENT:
London Development Agency / Thames Gateway
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide
END USE:
Residential
Integrated Remediation Strategy Bromley-by-Bow
CLIENT:
ProLogis
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs, Cyanide, Ammonia
END USE:
Commercial
Remediation works (PRB) at Royal Wharf
CLIENT:
Cognition Land and Water (Ballymore Group & Oxley Holding)
REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB)
CONTAMINATION:
Heavy metals
END USE:
Residential
Permeable Reactive Barrier Isle of Dogs
CLIENT:
The Odyssey
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH, BTEX, Heavy Metals
END USE:
Residential
E-Clay Stabilisation Greenwich
CLIENT:
Bellway Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
BTEX, Naphthalene
END USE:
Residential
Permeable Reactive Barrier Bermondsey
CLIENT:
Mansell Construction
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Permeable Reactive Barrier Purley Way
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive barrier
CONTAMINATION:
BTEX, PAHs, TPH, Heavy Metals, Ammonia, Cyanide, Phenols
END USE:
Residential
E-Clay Stabilisation Kew Riverside Richmond
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
PAHs, Heavy Metals
END USE:
Residential
Integrated Remdiation Strategy Uxbridge
CLIENT:
Galliford Try
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Integrated Remediation Strategy West Drayton
CLIENT:
Acton Housing
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier, ex-situ E-Clay stabilisation / solidification
CONTAMINATION:
BTEX, Solvents, Chlorinated Hydrocarbons
END USE:
Residential
Permeable Reactive Barrier at Walton-on-Thames (PRB)
CLIENT:
Willmott Dixon
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH & ammonia
END USE:
Leisure
Remediation works (E-Clay PRB) at Harmondsworth
CLIENT:
Kingswood Commercial Developments
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Chlorinated Hydrocarbons
END USE:
Commercial
Bentonite cut off wall at Dorney Lake, Dorney
CLIENT:
Eton College
REMEDIATION STRATEGY:
Low Permeability Groundwater Barrier
CONTAMINATION:
Designed to reduce draining of lake
END USE:
Rowing Lake
Remediation works at former gas works Maidstone
CLIENT:
FC Property Management
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation & E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs, Heavy Metals, Ammonia, Cyanide, Phenol
END USE:
Retail
Remediation works West Kent Cold Store, Dunton Green
CLIENT:
Berkeley Homes
REMEDIATION STRATEGY:
E-Clay PRB & Low permeability barrier
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Remediation works (E-Clay stabilisation) at Chineham
CLIENT:
Laing Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, Heavy Metals
END USE:
Residential
Remediation works (permeable reactive barrier) at Astolat Estate, Guildford
CLIENT:
QDS
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Remediation works at Hills Farm Lane, Horsham
CLIENT:
Osborne Homes
REMEDIATION STRATEGY:
E-Clay Stabilisation using Wirtgen
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Remediation works (bioremediation) at Bishop’s Waltham
REMEDIATION STRATEGY:
Bioremediation
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Remediation works at former Tannery site Milbourne Port
CLIENT:
Ford Civil Engineering
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
Heavy Metals (arsenic, cadmium & chromium)
END USE:
Residential
Remediation works of former gas works site Isle of Wight
CLIENT:
River Yar Boatyard
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
Heavy metals, cyanide, TPH & PAH
END USE:
Commercial
Remediation works of former Pitwines Gas Works (Poole)
CLIENT:
Crest Nicholson
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide, Phenol, Ammonia
END USE:
Residential
Remediation works of former Gales Saw Mill, Moretonhampstead
CLIENT:
Stevens Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
PAHs, Heavy Metals
END USE:
Residential
Remediation works of former tar tank base at oil / fuel facility Plymouth
CLIENT:
Greenergy
REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, material management
CONTAMINATION:
TPH, PAH and asbestos (fibres and ACM)
END USE:
Commercial
Remediation of hydrocarbon contaminated soils
CLIENT:
Maxol
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
BTEX, TPH
END USE:
Residential
Remediation works of contaminated soils from Kent Station Co Cork
CLIENT:
Atlas Environmental
REMEDIATION STRATEGY:
E-Clay Stabilisation and bioremediation
CONTAMINATION:
Heavy Metals, DOC
END USE:
Disposal to landfill as INERT waste
Remediation of hydrocarbon and heavy metal impacted soils by E-Clay stabilisation.
CLIENT:
Laoise Sawmills
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Commercial
Remediation works Waterford
CLIENT:
David Flynn Limited
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Residential
Hydrocarbon Remediation Waterford
CLIENT:
Aldi
REMEDIATION STRATEGY:
in-situ E-Clay Stabilisation & bioremediation
CONTAMINATION:
TPH
END USE:
Supermarket Development
Remediation works of contaminated (TBT) marine dredged sediments for reuse as engineering fill Mylor Harbour
CLIENT:
Mylor Yacht Harbour
REMEDIATION STRATEGY:
E-Clay treatment of marine sediments
CONTAMINATION:
TriButyl Tin (TBT)
END USE:
Commercial
Remediation works of heavy metal waste to enable reuse at Vale Refinery, Clydach (2010/11)
CLIENT:
Vale Refinery
REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)
CONTAMINATION:
Heavy metals (nickel & copper)
END USE:
Commercial
Remediation works associated with former scrap yard, Pyle
CLIENT:
Celtic Recycling
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Integrated remediation works of former industrial site, Bromsgrove
CLIENT:
Chase Commercial
REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation, PRB & Material management
CONTAMINATION:
TPH, PAHs
END USE:
Retail
Bioremediation Scunthorpe
CLIENT:
MFM Developments
REMEDIATION STRATEGY:
Bioremediation
CONTAMINATION:
TPH, PAH (including naphthalene)
END USE:
Residential
Japanese Knotweed Management Clent
CLIENT:
Lodge Park Limited
REMEDIATION STRATEGY:
Japanese Knotweed Management / Removal
CONTAMINATION:
Japanese Knotweed
END USE:
Residential
Remediation works of former industrial site Coventry
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Total Petroleum Hydrocarbons and Tributyl Tin
END USE:
Residential
Featured Case Studies
Atlantic Wharf, Cardiff (Second Phase) – Ground Investigation
Envirotreat was appointed by Robertson Construction to complete a second […]
Soil Management Plan Olive Primary School
Envirotreat was commissioned by Bouygues UK to provide support (soil […]
Materials management (soils) Castings, Brownhills
Envirotreat was commissioned by Sedon Group (on behalf of Castings […]
Enabling works and surplus soils removal – Media City Plot D1
The development lies immediately adjacent to the Manchester Ship Canal, […]
Source Treatment – Pershore Street, Birmingham
Site Background & History The site was located off Pershore […]