Camden Street, Birmingham

Envirotreat was commissioned by Kavannagh Construction to provide a watching brief during to the enabling works being undertaken to develop the former Heaton House site. Previous site investigation had indicated elevated heavy metal contamionation at various locations onsite. Envirotreate assisted Kavannagh Construction  with assessement and stockpiling of excvated soils to acheive the development objectives.

Envirotreat sampled and tested stockpiled surplus soils, prior to prepaing a WM3 assessment for the removal off site.

A previously unidentified underground storage tank was located durin gthe enabling works, Envirotreat assisted Kavannagh Construction with its safe removal and delineation of surrounding soils.