The Parc Trostre development in Llanelli generated a large surplus of natural soil. Envirotreat proposed a completely sustainable option. This would enable the soil to be fully reused under the CL:AIRE Definition of Waste Code of Practice – DoWCoP.
A materials management plan (MMP) was prepared and declared as part of the DoWCoP to enable the direct transfer of the soil to the Pembrey Race Circuit.
It was estimated that around 3,700 tonnes of soil was recovered by this approaxh. Which aided the construction of noise bunds around the perimeter of the race track. This strategy also diverted a valuable resource from landfill.
A conprehensive Validation Report was compiled at the completion of the work.