DowCoP – Pembrey Racing Circuit / Gwynfaen

Transfer of natural soils between two site being being undertake via the CL:AIRE Definition of Waste Code of Practice (DoWCoP).

Envirotreat was commissioned by Gower Plant to prepare the necessary information & documentation and obtain QP sign off (approval) for a direct transfer of up to 30,000 tonne of natural soils from a new Pobl / Coastal Housing development.

The soils are being used to construct sound bunds at the local race circuit at Pembrey.

Envirotreat previously undertook a comprehensive site investigation in 2020 at the race circuit and transferred soils to the Pembrey circuit in 2021 from the new Aldi / Costa Coffee development at Parc Trostre.