Based on the outcomes of the treatability trials undertaken by Envirotreat, the following remediation strategy was agreed:
• In-situ E-Clay Stabilisation of spent oxide material in the larger gasholder
• Ex-situ Stabilisation of spent oxide material from the two smaller gasholders
• Provision of a comprehensive Validation and Verification Report on completion