Newbury Gas Works

Working with Cognition Land & Water, Envirotreat designed and installed a barrier system around the former Newbury Gas Works, consisting of sections of E-Clay Permeable Reactive Barrier and Low Permeability (Cut-Off Wall) Barrier. The works were undertaken in November and December 2018.

An CFA rig (supplied by AGD Equipment) and auger was used to install the deep barrier sections and an excavator with long reach boom for the shallower sections and critical areas next the Network Rail main power sub-station.