Site Investigation – Shotley Gate
CLIENT:
Wavensmere Homes / Galliard Homes
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
TPH Remediation & Asbestos in Soil Management – Ebbw Vale, South Wales
CLIENT:
Jones Brothers (Henllan) Limited
REMEDIATION STRATEGY:
E-Clay Stabilisation, Asbestos in soil management
CONTAMINATION:
TPH, Asbestos
END USE:
Commercial
Site Investigation Aston Birmingham
CLIENT:
Key Land Capital Ltd
REMEDIATION STRATEGY:
Site Investigation
END USE:
Commercial
Site Investigation at Shotley Gate, Ipswich
CLIENT:
Wavensmere Homes
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Site Investigation at Two Sisters (Cavanagh & Grey) Carlisle
CLIENT:
Meal Solutions (Two Sisters)
REMEDIATION STRATEGY:
SIte Investigation
END USE:
Food Manufacturing & Distribution
Site Investigation at The Gothic Public House, Birmingham
CLIENT:
Kavannagh Construction
REMEDIATION STRATEGY:
Site Investigation
END USE:
Residential
Llanelli Direct Transfer of Natural Soils under the CL:AIRE Code of Practice
CLIENT:
JBHL
REMEDIATION STRATEGY:
Direct transfer (natural soils)
CONTAMINATION:
None
END USE:
Acoustic bunds
Soil Management, Northampton
CLIENT:
ADI Group
REMEDIATION STRATEGY:
Material Management, Waste Recovery & Watching Brief
CONTAMINATION:
TPH
END USE:
Commercial
Site Investigation, Tank Removal and Hydrocarbon Remediation – Bromsgrove Road, Halesowen
CLIENT:
N F Chancellor
REMEDIATION STRATEGY:
UST Removal and E-Clay stabilisation
CONTAMINATION:
Hydrocarbon
END USE:
Commercial
Watching Brief, Soil Testing & Validation – Camden Street, Birmingham
CLIENT:
Kavannagh Construction
REMEDIATION STRATEGY:
Watching brief
CONTAMINATION:
Heavy metals
END USE:
Residential
Site Investigation for a Residential Development – Baynton Road, Bristol
CLIENT:
Developments Bristol
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Site Investigation for a new Residential Development – Belgrave Middleway, Birmingham
CLIENT:
Confidential
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Atlantic Wharf (Phase 2)
CLIENT:
Robertson Construction
REMEDIATION STRATEGY:
Site Investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Remediation at Cefn Saeson School, Neath
CLIENT:
Prichard Holdings
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH and heavy metals (lead and zinc)
END USE:
School
Alveley Waste Characterisation WM3
CLIENT:
Greyhound Homes
REMEDIATION STRATEGY:
Soil testing
CONTAMINATION:
Not applicable
END USE:
Residential
Tredegar Waste Characterisation (WM3)
CLIENT:
JBHL
REMEDIATION STRATEGY:
Soil testing
CONTAMINATION:
Not applicable
END USE:
Industrial
Clydach, Swansea Soils Characterisation
CLIENT:
Trident Civil Engineering
REMEDIATION STRATEGY:
Soil testing
CONTAMINATION:
Not applicable
END USE:
Industrial
Llanelli Waste Characterisation WM3
CLIENT:
JBHL
REMEDIATION STRATEGY:
WM3
CONTAMINATION:
Not applicable
END USE:
Commercial
Pontprennau, Cardiff Waste Characterisation (WM3)
CLIENT:
JBHL
REMEDIATION STRATEGY:
WM3 Assessment
CONTAMINATION:
None
END USE:
Commercial
Minsterley Residential Development
CLIENT:
TC Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Residential
Herbert Road, Newport, Gwent
CLIENT:
Engie
REMEDIATION STRATEGY:
Material Management and Waste Recovery
CONTAMINATION:
Metals, hydrocarbons and asbestos
END USE:
Residential
All Saints Garage, Bromsgrove (Remediation).
CLIENT:
DES (Demolition)
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Residential
All Saints Garage, Bromsgrove (Site Investigation).
CLIENT:
DES (Demolition)
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TPH
END USE:
Residential
Parc Afon regeneration, Bridgend
CLIENT:
Bridgend Council
REMEDIATION STRATEGY:
Site investigation Appraisal
CONTAMINATION:
Not applicable
END USE:
Mixed
Sansome Walk, Worcester
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Hereford Medical Centre
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Medical
Fleetwood
CLIENT:
Castle Environmental
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Industrial
Pembrey Racing Circuit
CLIENT:
Pembrey Racing Circuit
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Leisure
Shire House, Lichfield
CLIENT:
Key Land Capital
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Chesterfield Road, Lichfield
CLIENT:
Key Land Capital
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Media City, Salford
CLIENT:
Bouygoes
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Mixed
END USE:
Residential
Ridgeway Industrial Estate, Iver
CLIENT:
Colonade Construction
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Metals and hydrocabons
END USE:
Industrial
Dumballs Road, Cardiff
CLIENT:
Bellerophon
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Mixed
Beorma Quarter, Birmingham
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TPH
END USE:
Residential
Castings, Cannock
CLIENT:
Seddons
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Industrial
Lunar Rise, Birmingham
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential
Moor Lane, Old Hill
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Residential Care Home
Stoke Ferry, Norfolk
CLIENT:
Chalcroft
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Asbestos and PERC
END USE:
Residential
Caswell Road, Northampton
CLIENT:
KWB
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
TCE and IPA
END USE:
Commercial / industrial
Glenside, Newport
CLIENT:
Jones Brothers (Henllan) Ltd
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Commercial
Croescarneinion Farm Landfill, Newport
CLIENT:
Site owners
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Barry Docks
CLIENT:
Cuddy Group
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Waterton Road, Bridgend
CLIENT:
Site owners
REMEDIATION STRATEGY:
Site investigation
CONTAMINATION:
Not applicable
END USE:
Not applicable
Ford Engine Plant, Bridgend
CLIENT:
Arcadis
REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub
CONTAMINATION:
TPH
END USE:
Commercial
Former Central Garage, Alveley, Shropshire (Site Investigation & Remediation)
CLIENT:
Greyhound Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Atlantic Wharf, Cardiff
CLIENT:
Cardiff City Council
REMEDIATION STRATEGY:
Ground Investigation
CONTAMINATION:
Not applicable
END USE:
Leisure
Olive Primary School, Birmingham
CLIENT:
Bouygues UK
REMEDIATION STRATEGY:
Waste classification, soil management
CONTAMINATION:
TPH, PAH, Heavy Metals
END USE:
School
Former Newbury Gas Works
CLIENT:
Cognition Land and Water
REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB) & Low Permeability Barrier
CONTAMINATION:
BTEX, TPH, PAH Phenols, ammonia, cyanide, heavy metals
END USE:
Residential
Former Boden Mill, Chard, Somerset
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
Supplementary SI, DQRA
CONTAMINATION:
TPH, PAH, Heavy Metals
END USE:
Leisure
Bus Station, Porth, South Wales
CLIENT:
Stagecoach
REMEDIATION STRATEGY:
Excavation & recycling at the Treatment Hub
CONTAMINATION:
TPH
END USE:
Commercial
Gulson Road, Coventry
CLIENT:
Gleeds
REMEDIATION STRATEGY:
Japanese Knotweed Management, Reduced Level Dig, Site Investigation, Off site soil disposal, watching brief
CONTAMINATION:
TPH, PAHs, Japanese Knotweed
END USE:
Residential
Sheepbridge
CLIENT:
Confidential
REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing and general earthworks
CONTAMINATION:
TPH, PAH, TCE and Chromium VI
END USE:
Commercial
Castings PLC, Brownhills
CLIENT:
Seddon Construction
REMEDIATION STRATEGY:
Material management, JKW & enabling works
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & JKW
END USE:
Commercial
Media City Plot D1
CLIENT:
Bouygues UK
REMEDIATION STRATEGY:
Materials Management & Watching brief
CONTAMINATION:
TPH, PAH & Heavy Metals
END USE:
Residential & Retail
Sylvester Street, Sheffield
CLIENT:
Cognition Land and Water
REMEDIATION STRATEGY:
Low Permeability Barrier
CONTAMINATION:
TPH
END USE:
Residential
High Street, Bordesley, Birmingham
CLIENT:
S. Evans Demolition
REMEDIATION STRATEGY:
Watching Brief
CONTAMINATION:
TPH, Heavy Metals
END USE:
Residential
Killybegs Harbour, County Donegal
CLIENT:
DAFM
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Tributyl Tin, TPH, Heavy Metals
END USE:
Commercial
Clarence Road, Sutton Coldfield
CLIENT:
Co-op Stores
REMEDIATION STRATEGY:
Demolition, UST removal, E-Clay stabilisation, PRB installation
CONTAMINATION:
TPH
END USE:
Retail
Former Fuel Depot, Tipner, Portsmouth
CLIENT:
Homes England
REMEDIATION STRATEGY:
Low Permeability Barrier
CONTAMINATION:
TPH, PAH, VOCs
END USE:
Residential and commercial
Cluster Site, Swindon
CLIENT:
Swindon Borough Council
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Landscaping Bunds
Roade (Chromium VI contamination)
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Ex-Situ E-Clay stabilisation
CONTAMINATION:
Hexavalent Chromium
END USE:
Residential
Pershore Street, Birmingham
CLIENT:
Thomas Vale (Bouygues)
REMEDIATION STRATEGY:
E-Clay stabilisation, material management and enabling works
CONTAMINATION:
Heavy metals
END USE:
Residential
JCB Uttoxter
CLIENT:
JCB
REMEDIATION STRATEGY:
Integrated E-Clay Stabilisation, E-Clay Permeable Reactive Barrier, asbestos amanagement and material management.
CONTAMINATION:
Total Petroleum Hydrocarbon, Polycyclic Aromtaic Hydocarbon and asbestos
END USE:
Residential
Bartoline Factory, Beverley
CLIENT:
C.R Reynolds (Construction)
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Commercial
River Embankment, Goole
CLIENT:
Environment Agency
REMEDIATION STRATEGY:
Low permeability barrier
CONTAMINATION:
Flood defence
END USE:
Flood defence
Stewart Park Middlesbrough
CLIENT:
Middlesbrough Council
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbon (TPH)
END USE:
Leisure
North Shore, Stockton on Tees
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Commercial
Lambton Coking Works, Sunderland
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Ammonia
END USE:
Residential
Beezon Road, Cumbria
CLIENT:
Homebase
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Tributyl Tin
END USE:
Commercial
Chapel Street, Appleby
CLIENT:
T. A Millard (Scotland)
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
PAHs, Ammoniacal Nitrogen, BTEX, Phenols, Heavy Metals
END USE:
Commercial
New Stevenston, Lanarkshire
CLIENT:
Robertson Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbons (TPH & PAH)
END USE:
Residential
Cathcart Place, Rutherglen
CLIENT:
South Lanarkshire Council
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilsation
CONTAMINATION:
TPH
END USE:
Commercial
Cambuslang Road, Glasgow
CLIENT:
Lidl
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Enabling works
CONTAMINATION:
Hydrocarbon (VOC, TPH & PAH) & Asbestos
END USE:
Retail
Dalmarnock Road, Rutherglen
CLIENT:
Clyde Gateway
REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation.
CONTAMINATION:
Gas works waste (cyanides, heavy metals & hydrocarbons (PAH & TPH)
END USE:
Not known
Rigby Street Glasgow
CLIENT:
Clyde Gateway
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
TPH
END USE:
Commercial
Kingston Yard, Port Glasgow
CLIENT:
Highmoor Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
Heavy Metals, TPH, PAHs, Cyanide
END USE:
Residential
Former Gas Works, Eshiels
CLIENT:
Scottish Borders Council
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, BTEX, Heavy Metals, Phenols,, PAHs
END USE:
Waste Transfer Station
St Rules, St Andrews
CLIENT:
Confidential
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation, E-Clay Permeable Reactive Barrier and low permeability barrier
CONTAMINATION:
Gas works waste (Cyanide, metals, PAH, ammonia & TPH)
END USE:
Residential
Macalpine Road, Dundee
CLIENT:
Lidl
REMEDIATION STRATEGY:
Ex-Situ E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Retail
Kintillo Road, Bridge of Earn, Perth
CLIENT:
Perthshire Housing Association
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Former ICI Detonators Site, Falkirk
CLIENT:
I&H Brown
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
Fulminate of Mercury, Lead Azide
END USE:
Residential
Bathgate
CLIENT:
Taylor Wimpey
REMEDIATION STRATEGY:
Stockpile removal, reduced level dig and offsite disposal
CONTAMINATION:
Asbestos
END USE:
Residential
Mill Street Gas Works, Airdrie
CLIENT:
Keller Ground Engineering
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, Ammonia, Cyanide, TPH, PAHs,
END USE:
Residential
Kirkconnel Drive Rutherglen
CLIENT:
Dawn Homes
REMEDIATION STRATEGY:
Reduced level dig, offsite disposal and treatment of JKW
CONTAMINATION:
Chromium VI and JKW
Muirend Playing Fields, Glasgow
CLIENT:
East Renfrewshire Council
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
Heavy metals (CrVI)
END USE:
Leisure
London Road, Kilmarnock
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Orchard Dene, Rowlands Gill
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH (Heating Oil)
END USE:
Residential
Rectory Lane, Guisborough
CLIENT:
Cundall, Johnstone & Partners
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification, underground tank removal
CONTAMINATION:
TPH, PAHs, Ammonia
END USE:
Car Parking
Dam Road, Barton-upon-Humber
CLIENT:
Keigar Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Cyanide
END USE:
Residential
High Street, Crowle
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Commercial (some residential)
Pudsey, Leeds
CLIENT:
Professional Remediation
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Dick Lane, Bradford
CLIENT:
Consort Homes (Northern)
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Corporation Street Gas Works, Middleton
CLIENT:
BAM Nuttall
REMEDIATION STRATEGY:
in-situ & ex-situ E-Clay Stabilisation / Solidfication
CONTAMINATION:
Ammonia, TPH, PAHs, Phenol
END USE:
Commercial
Millgate Gasworks, Stockport
CLIENT:
Matalan
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, Phenol, Ammonia, BTEX, PAHs
END USE:
Retail
Moor Lane, Mansfield
CLIENT:
Ben Bailey Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Derwent Way, Matlock (A6 Diversion)
CLIENT:
Birse Civils
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Harpurhey
CLIENT:
Manchester City Council
REMEDIATION STRATEGY:
Treatability trials
CONTAMINATION:
Gas Works Waste (iron cyanide compounds)
END USE:
Open space
Gould Street, Manchester
CLIENT:
National Grid
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
Gas Works Waste (iron cyanides, phenols, TPH, PAH and ammonia)
END USE:
Statutory remediation
Media City Plot C1
CLIENT:
Bouygues
REMEDIATION STRATEGY:
Watching brief and soil management
CONTAMINATION:
TPH, PAH & Heavy Metals
END USE:
Residential & Retail
Wilmslow Road, Handforth
CLIENT:
McLean Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Former Coking Works, Ollerton
CLIENT:
Encia Terracare
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
BTEX, TPH, PAHs, Phenol, Ammonia
END USE:
Residential
Burslem College, Stoke
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Site investigation, Material management Capping validation
CONTAMINATION:
Asbestos, Heavy metals & Hydrocarbons (TPH & PAH)
END USE:
Educational
Caulden Campus Stoke
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Site investigation, Material management & Capping validation
CONTAMINATION:
Heavy metals, Hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
London Road, Woore
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, BTEX
END USE:
Residential
Shropshire Union Canal, Shebdon
CLIENT:
British Waterways
REMEDIATION STRATEGY:
In-situ stabilisation
CONTAMINATION:
Not applicable
END USE:
Leisure
Basin Lane, Tamworth
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Davidson Road, Lichfield
CLIENT:
Galliford Try
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Groundwater treatment
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Chester Road, Stonnall, Walsall
CLIENT:
Confidential
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Roade (Trichloroethene contamination)
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
TCE
END USE:
Residential
Cooks Way, Hitchin
CLIENT:
Redrow Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Heavy Metals
END USE:
Residential
Cook’s Shipyard, Wivenhoe, Essex
CLIENT:
Bryant Homes
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Heavy Metals
END USE:
Residential
Moorside, Colchester
CLIENT:
Insight Investments
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier & Free Phase Product Removal
CONTAMINATION:
TPH
END USE:
Commercial / Retail
Cranes Fluid Systems, Ipswich
CLIENT:
Cranes Fluid Systems
REMEDIATION STRATEGY:
Ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, heavy Metals
END USE:
Commercial
Wisbech Road Kings Lynn
CLIENT:
Freebridge Community Housing
REMEDIATION STRATEGY:
Tank removal, ex-situ E-Clay stabilisation & Low permeability barrier
CONTAMINATION:
Former PFS (TPH)
END USE:
Residential
Gayton Norfolk
CLIENT:
Chalcroft
REMEDIATION STRATEGY:
Site investigation, treatability trials, gas monitoring, tank removal, and E-Clay stabilisation.
CONTAMINATION:
TPH, Pesticides and Herbicides
END USE:
Residential
RAF Lakenheath, Suffolk
CLIENT:
Vinci
REMEDIATION STRATEGY:
Source removal & Material management
CONTAMINATION:
Mercury
END USE:
Commercial
Stamford Gas Works, Lincolnshire
CLIENT:
Ashmill Building Integrity
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Gas works waste (Ammonia, cyanide, TPH & PAH)
END USE:
Residential
Harvey Reeves Road / Ransome Road, Northampton
CLIENT:
English Partnerships
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHS, Ammonia, Heavy Metals, Ammonia
END USE:
Commercial
Evington Valley Road, Leicester
CLIENT:
Leicester City Council
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification, free product removal
CONTAMINATION:
TPH, PAHs
END USE:
Educational
Desford Lane Kirby Muxloe, Leicestershire
CLIENT:
Crown Crest (Leicester) PLC
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
TPH
END USE:
Commercial
King Edward Road, Nuneaton
CLIENT:
Bryant Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH
END USE:
Residential
Former Acordis Acetate, Coventry
CLIENT:
Trebor Developments
REMEDIATION STRATEGY:
Material management
CONTAMINATION:
Hydrocarbon (PAH & TPH), Heavy metals and Asbestos
END USE:
Commercial
Sidney Stringer School, Coventry
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Material management
CONTAMINATION:
Hydrocarbons (TPH & PAH) & Asbestos
END USE:
School
Tauheedul School, Coventry
CLIENT:
Thomas Vale Constrcution
REMEDIATION STRATEGY:
Material management & Japanese Knot Weed
CONTAMINATION:
Heavy metals, TPH, asbestos & Japanese Knot Weed
END USE:
Educational
Forge Mills Park, Coleshill
CLIENT:
Tame Construction
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Crompton Road Birmingham
CLIENT:
Midland Heart
REMEDIATION STRATEGY:
Ex-situ & In-situ E-Clay stabilisation & PRB
CONTAMINATION:
Hydrocarbon (VOC & TPH)
END USE:
Residential
Tauheedul School, Birmingham
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Material management & Gas protection / capping validation
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
Coventry Road, Birmingham
CLIENT:
Chase Midland Estates
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation & Permeable Reactive Barrier
CONTAMINATION:
TPH
END USE:
Retail
Edgbaston Cricket Ground
CLIENT:
Homes & Communities Agency
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection validation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Mill Street, Tipton
CLIENT:
MarCity Homes
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Residential
Four Crosses, Staffordshire
CLIENT:
Baynham Meikle Partnership
REMEDIATION STRATEGY:
JKW eradication, Site Investigation and Environmental Risk Assessment
CONTAMINATION:
JKW, TPH and Spent Oxide (Landfill)
END USE:
Commercial
Former Springfield Brewery, Wolverhampton
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Watching Brief, Materials Management
CONTAMINATION:
Heavy metals, hydrocarbon (TPH & PAH) & Asbestos
END USE:
Educational
Wobaston Road Wolverhampton
CLIENT:
Seconique
REMEDIATION STRATEGY:
E-Clay stabilisation, PRB, crushing, tank removal, drainage, installation of gas membrane and new floor slab
CONTAMINATION:
TPH, Chromium VI, TCE and PERC
END USE:
Commercial (Retail and storage)
Budbrooke Point, Warwick
CLIENT:
Chase Commercial
REMEDIATION STRATEGY:
In-situ E-clay stabilisation & PRB
CONTAMINATION:
Hydrocarbons (VOC, PAH & TPH)
END USE:
Commercial
Warwick Gas Works, Ansell Way, Saltisford
CLIENT:
George Wimpey
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
BTEX, TPH, PAH, Heavy Metals,
END USE:
Residential
Former Rolling Mills, Stourbridge
CLIENT:
Thomas Vale Construction
REMEDIATION STRATEGY:
Japanese Knotweed Removal
CONTAMINATION:
Japanese Knotweed
END USE:
Residential
Stratford upon Avon
CLIENT:
Speller Metcalfe
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation
CONTAMINATION:
Hydrocarbon (TPH & PAH)
END USE:
Commercial
Llwyneinion Tar Lagoons, Wrexham
CLIENT:
Wrexham Borough Council
REMEDIATION STRATEGY:
ex situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, BTEX, Cyanide, Phenols, Heavy Metals
END USE:
Unknown
Southend-on-Sea Gas Works
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Spent Oxide (Blue Billy), BTEX, Phenol
END USE:
Residential
Integrated remediation of former petrol filling station (Sandon).
CLIENT:
Anderson Group
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation, PRB, Gas protection / capping validation
CONTAMINATION:
Former PFS (TPH)
END USE:
Residential
Beehive Lane, Chelmsford
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Phenols, Heavy Metals,
END USE:
Residential
Remediation works at Tilbury Docks
CLIENT:
SSE
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
Heavy metals & Hydrocarbon (TPH & PAH)
END USE:
Commercial
Chingford, London
CLIENT:
Anderson Group
REMEDIATION STRATEGY:
Tank removal / validation, Ex-situ E-Clay stabilisation & PRB
CONTAMINATION:
TPH & Naphthalene
END USE:
Residential
Pickersleigh Road, Malvern
CLIENT:
Confidential
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
VOCs & SVOCs
END USE:
Residential
Remediation of Blue Billy contaminated soils at Tondu
CLIENT:
Jehu
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Spent Oxide (free / complex cyanide)
END USE:
Residential
Remediation works for the treatment of waste at Vale Refinery, Clydach
CLIENT:
Vale Refinery
REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)
CONTAMINATION:
Heavy metals and hydrocarbon
END USE:
Commercial
Remediation works Swansea
CLIENT:
Jone Brothers (Henllan) ltd
REMEDIATION STRATEGY:
Site investigation and offsite disposal to Treatment Hub
CONTAMINATION:
TPH and PAH
END USE:
Residential
Remediation works (Hub & Cluster) Llanelli
CLIENT:
Gwalia
REMEDIATION STRATEGY:
Ex-situ E-Clay stabilisation
CONTAMINATION:
PAH, heavy metals, asbestos & JKW
END USE:
Residential
London Road, Romford
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, BTEX
END USE:
Residential
Wantz Road, Dagenham
CLIENT:
The London Borough of Barking & Dagenham
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Chlorinated Hydrocarbons
END USE:
Commercial
Exeter Road, Walthamstow
CLIENT:
Family Housing Association
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Wick Lane, Bow
CLIENT:
Henley Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH, Phenol, VOCs
END USE:
Residential
Remediation works at former landfill Barking Riverside
CLIENT:
Barking Riverside
REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, PRB & low permeability barrier
CONTAMINATION:
Spent oxide (Cyanides), heavy metals, Hydrocarbons (TPH & PAH) & Ammonia
END USE:
Residential and other
Armada Way, Beckton
CLIENT:
London Development Agency / Thames Gateway
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide
END USE:
Residential
Twelvetrees Crescent, Bromley-by-Bow
CLIENT:
ProLogis
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs, Cyanide, Ammonia
END USE:
Commercial
Remediation works (PRB) at Royal Wharf
CLIENT:
Cognition Land and Water (Ballymore Group & Oxley Holding)
REMEDIATION STRATEGY:
Permeable Reactive Barrier (PRB)
CONTAMINATION:
Heavy metals
END USE:
Residential
Winkley’s Wharf, Isle of Dogs
CLIENT:
The Odyssey
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH, BTEX, Heavy Metals
END USE:
Residential
New Haddo Estate, Greenwich
CLIENT:
Bellway Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
BTEX, Naphthalene
END USE:
Residential
Arnold Estate, Bermondsey
CLIENT:
Mansell Construction
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Purley Way, Croydon
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
E-Clay Permeable Reactive barrier
CONTAMINATION:
BTEX, PAHs, TPH, Heavy Metals, Ammonia, Cyanide, Phenols
END USE:
Residential
Kew Riverside, Richmond
CLIENT:
Barratt Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
PAHs, Heavy Metals
END USE:
Residential
Cowley Road, Uxbridge
CLIENT:
Galliford Try
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Colham Mill Road, West Drayton
CLIENT:
Acton Housing
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier, ex-situ E-Clay stabilisation / solidification
CONTAMINATION:
BTEX, Solvents, Chlorinated Hydrocarbons
END USE:
Residential
Permeable Reactive Barrier at Walton-on-Thames (PRB)
CLIENT:
Willmott Dixon
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAH & ammonia
END USE:
Leisure
Remediation works (E-Clay PRB) at Harmondsworth
CLIENT:
Kingswood Commercial Developments
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
Chlorinated Hydrocarbons
END USE:
Commercial
Bentonite cut off wall at Dorney Lake, Dorney
CLIENT:
Eton College
REMEDIATION STRATEGY:
Low Permeability Groundwater Barrier
CONTAMINATION:
Designed to reduce draining of lake
END USE:
Rowing Lake
Remediation works at former gas works Maidstone
CLIENT:
FC Property Management
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation & E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs, Heavy Metals, Ammonia, Cyanide, Phenol
END USE:
Retail
Remediation works West Kent Cold Store, Dunton Green
CLIENT:
Berkeley Homes
REMEDIATION STRATEGY:
E-Clay PRB & Low permeability barrier
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Remediation works (E-Clay stabilisation) at Chineham
CLIENT:
Laing Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
TPH, Heavy Metals
END USE:
Residential
Remediation works (permeable reactive barrier) at Astolat Estate, Guildford
CLIENT:
QDS
REMEDIATION STRATEGY:
E-Clay Permeable Reactive Barrier
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Remediation works at Hills Farm Lane, Horsham
CLIENT:
Osborne Homes
REMEDIATION STRATEGY:
E-Clay Stabilisation using Wirtgen
CONTAMINATION:
Heavy Metals, PAHs
END USE:
Residential
Remediation works (bioremediation) at Bishop’s Waltham
REMEDIATION STRATEGY:
Bioremediation
CONTAMINATION:
TPH, PAHs
END USE:
Residential
Remediation works at former Tannery site Milbourne Port
CLIENT:
Ford Civil Engineering
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
Heavy Metals (arsenic, cadmium & chromium)
END USE:
Residential
Remediation works of former gas works site Isle of Wight
CLIENT:
River Yar Boatyard
REMEDIATION STRATEGY:
E-Clay PRB
CONTAMINATION:
Heavy metals, cyanide, TPH & PAH
END USE:
Commercial
Remediation works of former Pitwines Gas Works (Poole)
CLIENT:
Crest Nicholson
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH, PAHs, Heavy Metals, Cyanide, Phenol, Ammonia
END USE:
Residential
Remediation works of former Gales Saw Mill, Moretonhampstead
CLIENT:
Stevens Homes
REMEDIATION STRATEGY:
ex-situ E-Clay Stabilisation / Solidification
CONTAMINATION:
PAHs, Heavy Metals
END USE:
Residential
Remediation works of former tar tank base at oil / fuel facility Plymouth
CLIENT:
Greenergy
REMEDIATION STRATEGY:
In-situ & ex-situ E-Clay stabilisation, material management
CONTAMINATION:
TPH, PAH and asbestos (fibres and ACM)
END USE:
Commercial
Remediation works of hydrocarbon contaminated soils Lisburn
CLIENT:
Maxol
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
BTEX, TPH
END USE:
Residential
Remediation works of contaminated soils from Kent Station Co Cork
CLIENT:
Atlas Environmental
REMEDIATION STRATEGY:
E-Clay Stabilisation and bioremediation
CONTAMINATION:
Heavy Metals, DOC
END USE:
Disposal to landfill as INERT waste
Remediation works at Laoise Sawmills
CLIENT:
Laoise Sawmills
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Commercial
Remediation works of hydrocarbon contamination at Waterford
CLIENT:
David Flynn Limited
REMEDIATION STRATEGY:
E-Clay Stabilisation
CONTAMINATION:
TPH
END USE:
Residential
Remediation works Waterford for of hydrocarbon contamination
CLIENT:
Aldi
REMEDIATION STRATEGY:
in-situ E-Clay Stabilisation & bioremediation
CONTAMINATION:
TPH
END USE:
Supermarket Development
Remediation works of contaminated (TBT) marine dredged sediments for reuse as engineering fill Mylor Harbour
CLIENT:
Mylor Yacht Harbour
REMEDIATION STRATEGY:
E-Clay treatment of marine sediments
CONTAMINATION:
TriButyl Tin (TBT)
END USE:
Commercial
Remediation works of heavy metal waste to enable reuse at Vale Refinery, Clydach (2010/11)
CLIENT:
Vale Refinery
REMEDIATION STRATEGY:
E-Clay stabilisation (waste recovery)
CONTAMINATION:
Heavy metals (nickel & copper)
END USE:
Commercial
Remediation works associated with former scrap yard, Pyle
CLIENT:
Celtic Recycling
REMEDIATION STRATEGY:
In-situ E-Clay stabilisation & PRB
CONTAMINATION:
TPH, PAHs
END USE:
Commercial
Integrated remediation works of former industrial site, Bromsgrove
CLIENT:
Chase Commercial
REMEDIATION STRATEGY:
Ex-situ & in-situ E-Clay stabilisation, PRB & Material management
CONTAMINATION:
TPH, PAHs
END USE:
Retail
Bioremediation Scunthorpe
CLIENT:
MFM Developments
REMEDIATION STRATEGY:
Bioremediation
CONTAMINATION:
TPH, PAH (including naphthalene)
END USE:
Residential
Japanese Knotweed Management Clent
CLIENT:
Lodge Park Limited
REMEDIATION STRATEGY:
Japanese Knotweed Management / Removal
CONTAMINATION:
Japanese Knotweed
END USE:
Residential
Remediation works of former industrial site Coventry
CLIENT:
Persimmon Homes
REMEDIATION STRATEGY:
E-Clay stabilisation
CONTAMINATION:
Total Petroleum Hydrocarbons and Tributyl Tin
END USE:
Residential
Featured Case Studies
Remediation works of hydrocarbon contamination at Waterford
Remediation works by E-Clay stabilisation of hydrocarbon contaminated soils and […]
Read MoreRemediation works of contaminated (TBT) marine dredged sediments for reuse as engineering fill Mylor Harbour
Remediation works by E-Clay stabilisation of TBT contaminated marine sediments […]
Read MoreRemediation works of heavy metal waste to enable reuse at Vale Refinery, Clydach (2010/11)
Remediation works by E-Clay stabilisation to produce an engineered material […]
Read MoreBioremediation Scunthorpe
Microbial bioremediation of hydrocarbon contaminated soils (TPH and PAH). […]
Read More- « Previous
- 1
- …
- 5
- 6
- 7