Envirotreat was commissioned by ADI to support their redevelopment of the part of the Eastleigh railway siding.
Envirotreat prepared an MMP to facilitate a sustainable solution for soil reuse.
In addition, Envirotreat undertook further gas monitoring relating to the development to enable the characteristic gas situation to be reduced, resulting in a significant cost saving to the client in terms of gas membrane requirements.
Envirotreat worked with ADI to gain Regulatory discharge of the planning conditions relating to contaminated land by producing a Validation Report of completion of the project prior to handover