Envirotreat has completed a site investigation at the Peel Power Station for Manx Utilities and Curtins.
The works involved the installation of a number of windowless and cable precussion boreholes.
Soil samples were taken for geotechincal and geoenvironemtal assessment.
Groundwater sampling were taken using via in-situ low-flow was undertaken including free product assessment via an oil/water interface dip meter and level loggers & barometric logger installed for monitoring groundwater levels.
On completion of the site works and ongoing monitoring, Envirotreat produced a factural report for Curtins