Envirotreat was commissioned by the landowner to design, gain regulatory approval and implement a remediation strategy to address human health and groundwater concerns relating the site former usage (GKN Sankey)
Envirotreat proposed E-Clay stabilisation to address source chromium (VI) contamination (which was only discovered during demolition and removal of the floor slabs) and an E-Clay PRB to address residual chromium (VI) and pervasive TCE contamination within the groundwater body which was impacting the adjoining river.
In addition, through comprehensive testing of soil onsite Envirotreat were able to assist with the surrender of the Environmental Permit for the site.